Verify Drill Fold
Refer to drill Operator Manual (160-219M-A),
“Implement Fold”
topic.
Do not attempt to fold or unfold without review of correct
operations in the Operator Manual. There are stop bolts and
wing locks, which, if not correctly used, can lead to machine
damage.
Slowly fold and unfold implement. Check for hydraulic
leaks. Be aware of any pinch points that might cause
damage or accelerate wear on hydraulic hoses.
Level Frame
Level Frame Side to Side
1. Check that the lift hydraulics are fully charged and
bled of air (page 23). if there is any air in the
system, or the system has not recently been re-
phased, you will not get correct level.
2. Unfold and raise the drill. Remove lock channels.
Set the depth control stop valve to stop the drill, in
lowering, just before the coulters touch the ground.
Check Center Height
Lay a straight edge across the top of the two coulter-
mount tubes on the center section (upper line in the
figure). Measure from the bottom of the straight edge to
the center of one rockshaft-wheel axle.
Note: The lowered rockshaft gauge wheel height is not
adjustable, so all adjustments are made relative to
this measurement.
Never fold implement unless transport locks are installed.
Figure 29
Frame Height Reference
16235