
BD7600 Min-Till Drills
Hydraulic Drive
Great Plains | 195-833b | 05/10/2022
4
7. The submeter
Calibration Factor
will be found by
running a calibration test.
8. Select the side directional arrow (2) to enter
Target
Rates
per submeter. Select
Meter Selection
to
change the selected meter if needed.
9. Select
Previous Screen
to return to the calibration
screen.
10. A calibration button (3) is at the right end of the
left-hand walkboard. Make sure the button is
pressed in (the off position) before continuing.
11. Tap
to begin the calibration routine.
12. Select the desired Metering System. On Split Box
equipped machines, Metering System 1 is the
front box compartment, Metering System 2 is the
rear box compartment.
13. In the field (4) by the meter icon, enter your
estimated tractor speed.
14. Enter how many rows you are catching per
submeter in the field (5) to the right of
Catching
Rows
.
For example, a 40 foot machine with 7.5 inch
spacing would have
5
rows caught per submeter.
It would be
5
whether you are catching 1 box, 2
boxes, or 3 boxes, because it is five rows per box.
15. Select the metering drives to use by tapping
Select Metering Drives
.
Meter
Selection
Previous
Screen
2
Meter
Selection
Previous
Screen
71598A
3
Adjustable Meter
Settings
Previous
Screen
Meter
Calibration
Previous
Screen
Run
Calibration
Select
Metering
Drives
4
5
Содержание BD7600
Страница 4: ...Cover ...
Страница 31: ...Table of Contents ...
Страница 32: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...