![GRE LEMON 790204 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/gre/lemon-790204/lemon-790204_instruction-manual_2259015051.webp)
51
• Assemble 2 columns with parts 1 PG + 4 PEAO + 1PEU2 using the TV bolts.
NOTE: THE NUTS SHOULD ALWAYS BE LOCATED ON THE INSIDE. THE ENTIRE PROCESS SHOULD BE
CARRIED OUT ON FIRM AND LEVEL GROUND, BEFORE EXCAVATING THE FOUNDATIONS. WE RECOMMEND
ASSEMBLING THE PARTS IN A LARGE AND LEVEL SPACE, TO MAKE IT EASIER.
1
Place the part PEU2 so that the four open holes on the sides with the second and third line of holes of the PG (see
diagram 1b) and that the side where the holes are rests on the upper part. Bolt the TV bolts when the PEAO parts have
been installed.
2
Bolt the two
PEAO
parts on each side of the
PG
crossbar, using the
TV
bolts and a spanner no. 13.
ASSEMBLY OF THE COLUMNS (OMEGA)
PEAO
PG
PV
PEU2
PEU
1x
=
1 PV640 + 1 PG + 4 PEAO + 1 PEU2 + 1PEU
(8 screws)
2
x2
x2
1
X
Содержание LEMON 790204
Страница 95: ...95...