background image

Contents

Page 3

CONTENTS

 

1 INTRODUCTION   4

 1.1 

About 

your 

boiler 

  4

 

1.2 

Boiler controls access 

 

4

 

1.3 

What the installer should leave

  you 

with 

   4

 1.4 

 

Commissioning 

  4

 

1.5 

Activating the guarantee 

 

4

 1.6 

Boiler 

servicing 

  4

 1.7 

Boiler 

data 

plate 

  4

2 USING 

YOUR 

BOILER 

  5

 2.1 

Lighting 

your 

boiler 

  5

 

2.2 

If your boiler fails to light 

 

5

 

2.3 

Turning off your boiler 

 

5

 2.4 

About 

your 

fuel 

  5

 2.5 

Boiler 

controls 

  5

 

2.6 

Heating system controls 

 

6

 2.7 

Electricity 

supply 

  6

CARING FOR YOUR BOILER 

 

6

 

3.1 

Checking sealed system pressure 

6

 

3.2 

How to fill or top up your

  sealed 

system 

  7

 3.3 

Expansion 

vessel 

  7

 3.4 

Ventilation   7

 

3.5 

Flue terminal and

  condensate 

disposal  7

 3.6 

Frost 

protection 

  8

 

3.7 

Failure of electricity supply   

8

 

3.8 

Cleaning your boiler 

 

8

AFTER SALES SUPPORT 

 

8

5 SERVICE 

LOG 

   9

 NOTES 

    11

Содержание VORTUT15-26

Страница 1: ...IRL DOC 0028 Rev 01 00 October 2022 Grant Vortex Utility Condensing Oil Boiler Range User Instructions...

Страница 2: ...x Low NOx and Blue Flame boilers DOES NOT comply with ErP requirements or EU regulations and as a result Grant does not condone its use If your boiler uses Bio Kerosene B30K refer to the installation...

Страница 3: ...If your boiler fails to light 5 2 3 Turning off your boiler 5 2 4 About your fuel 5 2 5 Boiler controls 5 2 6 Heating system controls 6 2 7 Electricity supply 6 3 CARING FOR YOUR BOILER 6 3 1 Checking...

Страница 4: ...ithin 30 days of its installation To register your boiler please ensure the completed boiler passport is returned to Grant or visit the Grant website www grant eu Your installer may have registered th...

Страница 5: ...itch to OFF To restart simply set the switch to On For long periods Set the On Off switch to OFF and switch off the electricity supply to the boiler If required the fuel supply valve may be closed and...

Страница 6: ...he radiator As the correct operation of a TRV is based on it sensing the air temperature of the room it is fitted in take care not to cover the TRV head with curtains furniture etc Refer to the manufa...

Страница 7: ...person should always be undertaken 3 4 VENTILATION Unless your boiler is installed with a balanced flue system you will require ventilation openings in your property to provide your boiler with a fres...

Страница 8: ...ith the annual service details recorded as appropriate Seciton 3 Caring for your Boiler Section 4 After Sales Support 3 6 FROST PROTECTION Your installer may have fitted a frost thermostat If not and...

Страница 9: ...Signature Service 4 Date Engineer Company name Telephone number OFTEC Technician number Comments Signature Service 5 Date Engineer Company name Telephone number OFTEC Technician number Comments Signa...

Страница 10: ...ce 12 Date Engineer Company name Telephone number OFTEC Technician number Comments Signature Service 13 Date Engineer Company name Telephone number OFTEC Technician number Comments Signature Service 1...

Страница 11: ...Page 11 Notes NOTES...

Страница 12: ...GRANT ENGINEERING IRELAND ULC Crinkle Birr Co Offaly R42 D788 Ireland Tel 353 0 57 91 20089 Email info grantengineering ie www grant eu...

Отзывы: