BURNER ON/STANDBY switch:

To switch off the burner when required, 
by interrupting the signal from the heating 
system controls, i.e. the remote programmer 
and room thermostat.

This switch MUST be left in the ON position 
during normal operation of the boiler. 

WARNING
This switch does NOT isolate the 
electrical supply to the burner. 

WARNING
After the burner has been switched off 
(either manually using the burner ON/
STANDBY switch on the control panel, 
automatically by the boiler temperature 
control, or the heating system controls) 
the burner needs to burn-down the 
remaining pellets in the brazier. 

Do not open the front combustion 
chamber access door until “WAIT 
BOILER THERMOSTAT” is showing on 
the burner control panel display.

• 

OVERHEAT thermostat:

This is a built-in safety device to automatically 
shut down the boiler if it overheats.

If this device should operate, it can be 
manually reset once the boiler has cooled 
down.

Switch the burner ON/STANDBY switch to 
‘STANDBY’ and allow the boiler to cool down. 

Then unscrew the plastic cap and press 
the reset button. If this overheat thermostat 
continually trips there may be a fault and you 
should contact your Installer.

• 

CLEANING AUTO/TEST switch:

When pressed and held in the TEST position, 
it allows the installer or Grant service engineer 
to manually operate and test the automatic 
cleaning systems in both heat exchangers. 
When released, it will automatically return to 
the default AUTO position to allow the boiler 
cleaning system to perform automatically. 

Only operate the cleaning switch when the 
boiler is not operating and ‘WAIT BOILER 
THERMOSTAT’ is showing on the burner 
control panel display.

NOTE

The Cleaning Auto/Test switch does NOT 
operate the brazier cleaning system. 

WARNING
After the burner has been switched off 
(either manually using the burner ON/
STANDBY switch on the control panel, 
automatically by the boiler temperature 
control, or the heating system controls) 
the burner needs to burn-down the 
remaining pellets in the brazier. 

Do not open the front combustion 
chamber access door until ‘WAIT BOILER 
THERMOSTAT’ is showing on the burner 
control panel display.

If the burner door is opened during the 
operation of the burner there can be 
a large uncontrollable flame from the 
brazier.

NOTE

Avoid repeated opening and closing of the 
boiler door as this will cause the automatic 
cleaning of the boiler and burner to be 
delayed. This can cause excessive ash build-
up within the boiler and burner that may result 
in nuisance faults occurring.  

4  Boiler Controls

Figure 4-1:Boiler Control Panel

4.1  Boiler Control Panel

The boiler control panel is located at the top
of the boiler. 

This control panel is fitted with three controls,
as follows:

Содержание spira

Страница 1: ...Part No DOC45 Rev00 October 2014 Grant Spira 6 26kW and 9 36kW Condensing Wood Pellet Boiler User Instructions...

Страница 2: ...0 Emptying the Ash Pan 12 11 Cleaning and Servicing 14 your Boiler 12 Ventilation 14 13 Electricity Supply 14 14 Sealed Central Heating system 14 15 Frost Protection 14 16 Corrosion and Protection 14...

Страница 3: ...de the boiler Figure 2 1 Contents switch in the base of the pellet hopper When there is no bulk store but the pellet hopper only the contents switch stops the burner operating when the minimum pellet...

Страница 4: ...ed with a self cleaning system to keep the heat exchanger tubes clear of ash build up As with the brazier cleaning system these are operated automatically after a pre set period has elapsed CAUTION Ev...

Страница 5: ...installer or Grant service engineer to manually operate and test the automatic cleaning systems in both heat exchangers When released it will automatically return to the default AUTO position to allo...

Страница 6: ...operate 5 C below the set point the boiler is in 100 power mode 5 C above the set point the boiler has reached minimum output The set point is NOT the temperature at which the burner stops The maximum...

Страница 7: ...r Messages The burner control panel display can also indicate that a fault has occurred with the boiler In the event of a fault one of the following error fault messages may be seen scrolling across t...

Страница 8: ...Installer as part of the commissioning process If for any reason the auger needs to be re primed this is a simple process using the following procedure Step 1 First set the burner ON STANDBY switch to...

Страница 9: ...ay Refer to Section 5 4 Active Symbols Set the burner ON STANDBY switch to ON The flue fan will start and pellets will be delivered to the burner for it to start NOTE If the burner ON STANDBY switch i...

Страница 10: ...rammer room thermostat etc calling for heat If not set controls to call for heat If after checking the above there is still a problem then contact your Installer for assistance STEP 4 Which one of the...

Страница 11: ...olling across the bottom of the burner control panel display Check the following Are the three plugs correctly fitted to the left side of the burner Press the RESET button on burner control panel to c...

Страница 12: ...the procedure below Step 1 Set the burner STANDBY ON switch to STANDBY Step 2 If the boiler is running at the time wait for it to complete the burner shut down sequence i e until the burner control pa...

Страница 13: ...both of the carrying handles one at the front and the other at the back carefully lift the ash pan out of the boiler Refer to Figure 10 7 Do NOT use the centre cross bar of the ash pan as a carrying...

Страница 14: ...d with your programmer for further details It is recommended that you check that the on off and time settings after a power failure has occurred WARNING The electricity connections to the boiler must...

Страница 15: ...heck Primary heat exchanger inspect clean Secondary heat exchanger inspect clean Wash system inspect clean Combustion chamber inspect clean Fan inspect clean Shaker mechanism grease Shaker system chec...

Страница 16: ...GRANT ENGINEERING UK LIMITED Hopton House Hopton Industrial Estate Devizes Wiltshire SN10 2EU Telephone 01380 736920 Fax 01380 736991 Email info grantuk com Website www grantuk com...

Отзывы: