background image

Page 12

Section 4: Electrical

OVER-TEMPERATURE CUT-OUT

This immersion heater is fitted with a Cotherm type TSR 

thermostat that incorporates an independent non-self-

resetting over-temperature cut-out to prevent excessive water 

temperatures.
The reset pin is located in a small opening to the side of the 

control dial and indicated by small triangle with the word ‘safety’. 

Refer to Figure 4-4. 
In normal operation the reset pin will be approximately 2-3mm 

below the surface of the plastic thermostat housing. 
Should the over-temperature cut-out operate, the reset pin will be 

pushed up to become level or slightly above the surface of the 

housing.

To reset the over-temperature cut-out:

• 

Isolate the volumiser/header and immersion element from the 

mains electrical supply.

• 

Wait for the temperature in the volumiser/header to fall 

sufficiently.

• 

Using a suitably sized implement, push the reset pin using 

hand pressure only to return it to its normal operating 

position.

! WARNING !

Ensure the volumiser/header and immersion heater is 

isolated from the mains before attempting to reset to 

over-temperature cut-out.

If the immersion heater needs to be replaced it must be fitted to 

the volumiser/header using the gasket provided on the unit. Only 

use a correctly shaped spanner. Stilsons or pipe grips should NOT 

be used. The use of sealing compound is not recommended.

! WARNING !

Always ensure that the immersion heater cap is not 

covered.

4.4 

ELECTRICAL CONNECTIONS BETWEEN 

 

LEAD AND SUPPLEMENTARY HEAT

 PUMPS

When using two Aerona³ heat pumps connected to the volumiser/

header, one of the two (the supplementary unit) will be controlled 

by the other (the lead unit).
The lead unit can be used to provide both Heating and DHW, but 

the supplementary unit will be used only for Heating.

Refer to Figure 4-5 below for details of the electrical connection 

between the two heat pumps.

Scale: NTS

Paper Size: A4

Project Title: Aerona³ ASHP Lead to Back-up unit connection details
Drawing Set: Aerona³ Wiring Schematics

Status: Approved

Rev Date: 20/01/22

Drawn By: CG

Checked By: PS & NS 

Dwg. No. HPWS0026

Revision: 1.1

This drawing and its content is subject to copyright. Use other than for its original intended purpose must be arranged with an employee of 

Grant UK Ltd.

Hopton House, Hopton Industrial Estate, Devizes, Wiltshire, SN10 2EU, tel; 01380 736920

Revision Details:

1.1 20/01/22 Approved

ASHP Terminals

N

41
42
43
44
51
52

45
46
47
48
49
50
N.C.

- Lead Unit -

ASHP Terminals

1

2
3
4
5
6
7
8

17
18
19

20
21
22
23
24

25

Aerona

³

Heat Pump

3     2     1

1      2     3     4

RL1

RL2

RL3

DHW

N

P

CH

Grant EP002 Heat Pump Interface

Common (Red)

Link

Heating (Blue)

Grant Aerona³ ASHP

Remote Controller

- Supplementary Unit -

Aerona³

Heat Pump

Figure 4-5: 

Wiring connections between lead and supplementary heat pumps

Содержание HPIDSYSLLHKIT

Страница 1: ...UK DOC 0184 Rev 0 3 PROVISIONAL February 2022 Grant Combined Volumiser Low Loss Header Installation Instructions...

Страница 2: ...y means without prior written consent IMPORTANT NOTE FOR USERS These installation instructions are intended to guide the installer in the installation of the Grant Combined Volumiser Low Loss Header S...

Страница 3: ...RICAL 10 4 1 General 10 4 2 Electrical connections 10 4 3 Immersion heater 11 4 4 Electrical connections between lead and supplementary heat pumps 12 5 OPERATION 13 5 1 General 13 5 2 Aerona heat pump...

Страница 4: ...nt Combined volumiser low loss header is an insulated rectangular tank fitted with an integral 3kW electric immersion heater This is housed within a weatherproof external casing with a removable cover...

Страница 5: ...0 Inlet outlet connections 1 BSP Drain cock connection BSP Manual air vent connection BSP Materials Shell Mild steel Outer casing Galvanised mild steel polyester powder coated Insulation Mineral wool...

Страница 6: ...G The Grant Combined volumiser low loss header is supplied wrapped in bubble wrap with a separate kit of components in a plastic bag located inside the top cover Refer to list of components given in S...

Страница 7: ...System Return System Flow System Flow System Return Second Zone Figure 3 1 Heat pump connections on left hand side Heat pump 1 Flow Heat pump 2 Flow Heat pump 2 Return Heat pump 1 Return System Return...

Страница 8: ...the flow regulator window Refer to Figure 3 3 If two heat pumps of the SAME output are connected to the low loss header volumiser both flow regulators should be set to the SAME flowrate as calculated...

Страница 9: ...3 Installation Page 9 Flow from heat pump Flow from heat pump Alternative position Flow to system Flow to system Alternative positions Flow to system Alternative position Figure 3 4 Volumiser only con...

Страница 10: ...ected to the heat pump terminal PCB Refer to Section 4 2 Electrical Connections 4 2 ELECTRICAL CONNECTIONS WARNING Ensure that all electrical supplies to the heat pump and volumiser header are isolate...

Страница 11: ...on heat pump Terminal PCB to Terminal N A1 on the backup heater relay Refer to Figure 4 3 for header volumiser connection diagram 3 Tighten the cable gland to securely grip the cable 4 3 IMMERSION HEA...

Страница 12: ...the immersion heater needs to be replaced it must be fitted to the volumiser header using the gasket provided on the unit Only use a correctly shaped spanner Stilsons or pipe grips should NOT be used...

Страница 13: ...n 5 3 for the correct parameter settings If a second Grant Aerona heat pump is to be used refer to Section 5 5 for the correct parameter settings for the operation of a supplementary heat pump 5 3 PAR...

Страница 14: ...me for a defrost should never be more than 5 minutes including the compressor protection off time of 3 minutes so the total power used during a defrost period by the immersion element would not be mor...

Страница 15: ...Group Code Default Min Max Setting I 21 00 Enable outgoing water set point 0 Fixed set point 1 Climatic curve 1 0 1 0 I 21 01 Fixed outgoing water set point 45 C 23 0 60 0 55 NOTE Refer to the Aerona...

Страница 16: ...GRANT ENGINEERING UK LIMITED Hopton House Hopton Industrial Estate Devizes Wiltshire SN10 2EU Tel 44 0 1380 736920 Fax 44 0 1380 736991 Email info grantuk com www grantuk com...

Отзывы: