Maintenance

7.1 Servicing and Maintenance

1. Servicing and maintenance must

only be carried out by a competent
unvented hot water installer, or by
Grant Engineering (UK) Limited
authorised personnel.

2. Before any work whatsoever is

carried out on the installation, it
MUST first be isolated from the
main’s electricity supply.

Both the primary and secondary
systems will contain very hot water
that will scald; therefore care should
be taken when opening any joints,
seals or valves.

3. Only use spare parts authorised by

Grant Engineering (UK) Limited. The
use of unauthorised spare parts will
invalidate the warranty.

4. Drain the cylinder – When draining

the cylinder, always switch off the
boiler and the immersion heater
first. Turn off the water supply at the
mains stopcock.

Connect a hose pipe to the drain
cock (see Figures 2-4 to 2-6) and
route it to a convenient gully. Open
the drain cock and all hot taps that
are served by the cylinder. The
cylinder may take several minutes to
empty completely.

5. In hard water areas it may be

necessary from time to time to
remove and de-scale the immersion
heater element. Replace the gasket
each time it is removed.

6. Remove the cartridge from the

pressure-reducing valve (PRV).
Check the strainer and if necessary
remove any debris from in front of
it. Replace the cartridge. Refer to
section 7.3 on the right.

7. Check the charge pressure in the

expansion vessel and top up as
necessary. The charge pressure
should be 3.0bar. Refer to section
7.5 on the right.

!

WARNING

8. Whilst the hose pipe is connected, the

drain cock open and with the
immersion heater removed, the
cylinder may be flushed out to remove
any debris, sand or lime scale particles
that may have collected in the bottom
by using a further hose pipe
connected to the cold water main.

9. Close the drain cock, disconnect

the hose, refit the immersion heater
and close all hot water taps before
reopening the stopcock. Allow the
cylinder time to fill whilst checking
for any leaks. Release any air from
the system by opening each hot
water tap individually, starting with
the one furthest from the cylinder.

10. Manually lift the expansion relief and

temperature and pressure relief
valve one at a time, every 12
months (more frequently in hard
water areas) to prevent debris from
building up behind the valve seat.
Whilst carrying out this operation,
check that the discharge to waste
is unobstructed. Check that each
valve seals correctly when released.
As the valves are pre-calibrated,
they require no further maintenance.

11. Finally switch on the mains

electricity supply to the immersion
heater and the boiler. As the system
heats up, check again for any leaks
and rectify as necessary.

7.2 Manifold Assembly

The manifold assembly should not,
under normal circumstance, require any
maintenance. During annual servicing it
may be necessary to inspect and/or
clean the line strainer, the pressure
reducing valve cartridge, expansion
relief valve cartridge. The frequency of
cleaning will depend on the local water
conditions.

7.3 Pressure Reducing Valve

1.  Isolate the cold water supply.

2.  Unscrew the retaining nut of the

valve. The complete operating
mechanism, including the strainer
can be removed.

3.  Clean the filter mesh and the

cartridge under running water.

4.  Replace cartridge ensuring that

strainer is correctly located and
reassemble the unit. Pressure
Reducing Valve cartridge and
strainer Part No. GCS07C - 3.0 bar.

7.4 Expansion Relief Valve
Cartridge

1.  Isolate the cold water supply.

2.  Remove grub screw (Allen Key 

type) from body of valve and
withdraw valve ensuring not to
damage O-ring.

3.  Clean valve seat face and seating -

do not scratch or damage either
seat face or seating.

4.  Refit in reverse order. Do not

overtighten. Expansion valve
cartridge Part No. GCS08.

7.5 Expansion Vessel

1.  Isolate the cold water supply.

2.  Open hot water taps.

3.  Drain cylinder to below tee piece

take off for expansion vessel flexible
hose.

4.  Replace expansion vessel after first

checking the air charge (and hose if
required).

5.  Close drain off cock and turn on

cold water supply.

6.  When water is flowing freely from

taps close taps.

Содержание DuoWave Direct 170

Страница 1: ...Grant DuoWave System Solar Cylinder Heat Pump Cylinder Ranges Installation User Instructions Part No DOC 75 Rev 06 January 2011 ...

Страница 2: ...ry Return 13 4 8 Tundish 13 4 9 Discharge Pipe 13 4 10 Discharge Pipe Arrangement 14 4 11 Discharge Pipe Sizing 14 4 12 Worked Example 14 5 Electrical Installation 15 5 1 Immersion Heater 15 5 2 Immersion Heater Wiring Instructions 15 5 3 Dual Thermostat 15 5 4 2 Port Valve 15 5 5 W plan System 16 5 6 Y plan System 17 5 7 S plan System 18 5 8 S plan System for Grant Aerona HP 19 5 9 Solar Thermal ...

Страница 3: ...direct cylinders are also supplied fitted with a single 3kW electric immersion heater DuoWave Solar direct cylinders have a single coil only for connection of solar thermal but are also supplied fitted with two 3kW electric immersion heaters Refer to page 15 for further details on immersion heaters In all cases each coil must be connected using a 2 port motorised valve to shut off the flow from th...

Страница 4: ...re bar 6 6 6 6 6 6 Temp pressure relief valve lift pressure bar 7 7 7 7 7 7 Temp pressure relief valve lift temperature C 90 90 90 90 90 90 Maximum primary circuit working pressure bar 3 3 3 3 3 3 Performance Top coil rating kW 8 50 8 50 8 50 8 50 10 00 16 00 Top coil recovery rate mins 18 20 25 26 25 27 Bottom solar coil rating kW 8 5 10 0 16 0 13 9 16 0 24 0 27 0 24hr standing loss kW direct and...

Страница 5: ...ion relief valve pressure bar 6 6 6 6 6 Temp pressure relief valve lift pressure bar 7 7 7 7 7 Temp pressure relief valve lift temperature C 90 90 90 90 90 Maximum primary circuit working pressure bar 3 3 3 3 3 Performance Top coil rating kW 32 0 47 0 47 0 55 6 55 6 Bottom solar coil rating kW 8 5 10 0 16 0 16 0 23 0 24hr standing loss kW 2 04 2 45 2 69 2 71 2 94 Check list Cylinder assembly 170 l...

Страница 6: ...ocket 22mm Solar flow not on 500 model Immersion heater factory fitted 22mm Cold water inlet 22mm Solar flow 500 model only 22mm Solar return 22mm Boiler return 0 30 Dims Model mm 170 200 250 300 400 500 A 200 200 200 200 200 235 B 275 275 275 320 320 N A C 330 330 330 375 400 600 D 380 380 380 420 420 620 E 460 460 460 510 510 715 F 540 660 795 860 1100 820 G 655 790 935 1005 1240 1120 H 735 870 ...

Страница 7: ... 1475 1980 I 1025 1170 1430 1695 2050 J 1075 1230 1480 1745 2110 Dia 580 580 580 580 580 Figure 2 2 DuoWave direct solar cylinder dimensions Dia A B C D E F G H I J DuoWave Direct Solar Cylinder Dimensions 40 30 22mm Hot water draw off 1 2 T P Relief valve factory fitted 22mm Secondary return Solar stat pocket 22mm Solar flow Immersion heater factory fitted Immersion heater factory fitted 22mm Col...

Страница 8: ...430 1695 2045 J 1075 1230 1480 1745 2110 Dia 580 580 580 580 580 2 4 Dimensions DuoWave HP Indirect Cylinders Figure 2 3 DuoWave HP indirect cylinder dimensions Dia A B C D E F G H I J DuoWave HP Indirect Cylinder Dimensions 40 30 0 30 22mm Hot water draw off 1 2 T P Relief valve factory fitted 22mm Heat pump flow 22mm Heat pump return 22mm Secondary return Solar stat pocket 22mm Solar flow Immers...

Страница 9: ...tted 13 4 BSPF Item Description Connection Size 12 Immersion heater c w control limit thermostat factory fitted 13 4 BSPF 13 Pressure reducing valve 3 bar 14 Balanced cold supply connection 22mm compression 15 Expansion relief valve 6 bar 15mm compression 16 Temperature Pressure relief 15mm compression valve 90 C 7 bar 17 Tundish 15 22mm compression 18 Discharge pipe not supplied with cylinder 19 ...

Страница 10: ...ry Solar heat source flow tapping 22mm compression 11 Immersion heater c w control limit thermostat factory fitted 13 4 BSPF Item Description Connection Size 13 Pressure reducing valve 3 bar 14 Balanced cold supply connection 22mm compression 15 Expansion relief valve 6 bar 15mm compression 16 Temperature Pressure relief 15mm compression valve 90 C 7 bar 17 Tundish 15 22mm compression 18 Discharge...

Страница 11: ...nections Solar Heating 1 The Solar flow and return connections should be made to the lower coil connections If the lower coil is not thermostatically controlled a 2 port or solenoid valve high temperature rated not supplied must be fitted in the flow and be controlled from the dual thermostat mounted at low level on the cylinder via the thermostat pocket 8 Contact Grant UK for details 2 If you are...

Страница 12: ...re Relief Valve The temperature and pressure relief valve T P Valve is supplied factory fitted to the cylinder The T P valve must not be removed from the cylinder or tampered with in any way The valve is pre set to lift at 7bar or 90 C and any attempt to adjust it will invalidate the warranty 4 5 Hot Water Supply 1 Connect the hot water supply pipe to the top outlet 1 of the cylinder 4 6 Preventio...

Страница 13: ...scharges a wire cage or similar guard is positioned to prevent contact whilst maintaining visibility c discharges at high level e g in to metal hopper and metal down pipe with the end of the discharge pipe clearly visible tundish visible or not or onto a roof capable of withstanding high temperature discharges of water and 3m from any plastics guttering systems that would collect such discharges t...

Страница 14: ...nce for quantity of 4 Ø22mm elbows at 0 8m each 3 2m Therefore the maximum permitted length equates to 5 8m 5 8m is less than the actual length of 7m therefore calculate the next largest size Maximum resistance allowed for a straight length of Ø28mm pipe D2 from a 1 2 diameter temperature relief valve equates to 18m Subtract the resistance for a quantity of 4 Ø28mm elbows at 1 0 each 4m Therefore ...

Страница 15: ...rol For the Indirect models two Dual Thermostats each a combined control and high limit thermostat are supplied separately with the unvented hot water safety kit One is fitted into the upper sensor pocket in the cylinder see Figures 2 4 to 2 6 for position to control the operation of the boiler or heat pump primary coil The second is fitted in the lower sensor pocket to control the operation of th...

Страница 16: ...mostat L N E 2 1 C C 1 2 1 2 3 4 5 6 7 N E L N E L N HW HTG L 8 9 10 2 1 3 Radiator Pump 3 port diverter valve not supplied 3 port divert valve not supplied Blue Blue Brown Brown Green Yellow 2 port zone valve supplied 2 port zone valve supplied Note Orange and grey wires not required electrically isolate High limit Control Junction box Time controller Boiler Pump Grant DuoWave Indirect water cyli...

Страница 17: ...der 3 port mid position valve not supplied 2 port zone valve supplied 230V 50Hz Room Thermostat L N E 2 1 C C 1 2 1 2 3 4 5 6 7 N E L N E L N HW On HW Off HTG L 8 9 10 2 1 3 Mid position zone valve White Blue Grey Blue Orange Brown Green Yellow 2 port zone valve supplied Green Yellow Note Orange and grey wires not required electrically isolate High limit Con trol Cylinder Dual Thermostat Top Coil ...

Страница 18: ...Boiler Radiator Pump 2 port zone valve supplied Grant DuoWave Indirect water cylinder 2 port diverter valve not supplied Cylinder Dual Thermostat Top Coil 230V 50Hz Room Thermostat L N E 2 1 C C 1 2 1 2 3 4 5 6 7 N E L N E L N HTG HW L 8 9 10 2 1 3 Zone valve DHW Zone valve HTG Blue Brown Green Yellow Grey Orange Grey Orange Blue Brown Green Yellow High limit Con trol Junction box Time controller ...

Страница 19: ...ith integral circulating pump Radiator 2 port zone valve supplied Grant DuoWave HP water cylinder 2 port diverter valve not supplied Cylinder Dual Thermostat Top Coil Grant Aerona Heat Pump Controls Connection 230V 50Hz Room Thermostat L N E 2 1 C C 1 2 1 2 3 4 5 6 7 N HTG HW L 8 9 10 2 1 3 Zone valve DHW Zone valve HTG Blue Brown Green Yellow Grey Orange Grey Orange Blue Brown Green Yellow High l...

Страница 20: ... GSD1 Controller 2 port or solenoid valve Not supplied Solar Circulating Pump Solar Collector Solar Pump Station Dual Thermostat Cylinder Temperature Sensor Collector sensor Cylinder bottom sensor N 230V GND Sensor Solar pump N E L N E L Solenoid valve Dual thermostat Solar coil 230V 3A fused supply L N E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Grant GSD1 Mk2 Controller 1 C C 1 2 ...

Страница 21: ...r will discharge from the tundish 1 The pressure reducing valve has malfunctioned This will cause a large volume of water to flow through the tundish 2 The Expansion relief valve is letting by This will cause a very low volume of water to flow through the tundish In both cases identify the defective component and replace All repairs must be carried out by a competent person 6 5 Hot Water Discharge...

Страница 22: ...l whilst checking for any leaks Release any air from the system by opening each hot water tap individually starting with the one furthest from the cylinder 10 Manually lift the expansion relief and temperature and pressure relief valve one at a time every 12 months more frequently in hard water areas to prevent debris from building up behind the valve seat Whilst carrying out this operation check ...

Страница 23: ...r correct operation If water is still discharging contact a competent Engineer Thermostat Failure Test Vessel and Recharge or Replace Immersion Thermostat Failure Primary Cylinder Thermostat Faulty T P Valve Repair or Replace Immersion Thermostat Repair or Replace Thermostat Replace T P Valve No Yes Yes Yes Yes No No 8 Fault Finding Guide ...

Страница 24: ...T P Valve Faulty Pressure Reducing Valve Replace T P Valve Replace Pressure Reducing Valve No Yes Yes Yes Yes Yes No No 8 3 No Flow from Hot Water Taps No Flow from Hot Water Taps Mains Supply Disconnected Test for correct operation If water is still not flowing contact a competent Engineer Open supply valve or wait for supply to be reconnected Mains Supply Disconnected Mains Supply Disconnected C...

Страница 25: ...t Water setting Is Motorised Valve working Is Boiler working Is Cylinder Stat Calling for Heat Check Motorised Valve motor and Micro switch Yes No No No No Yes Yes Yes Yes Test for correct operation If water is still cold contact a competent Engineer Has Thermal Cut Out Operated Check and Reset Button Check and Replace Cylinder Thermostat No Yes ...

Страница 26: ...ystem Wiring correct Correct Wiring as per instructions Is Cylinder Thermostat Operating Replace Cylinder Thermostat No Yes Yes Yes No No Test for correct operation If water is still cold contact a competent Engineer Does Motorised Valve close when Thermostat is satisfied Repair or Replace Motorised Valve Motor Repair or Replace Motorised Valve Fault Contact Engineer Yes No ...

Страница 27: ...erm type ELE14 IN 800 UNV GCS30 Drain Cock GCS14 Immersion Heater Thermostat Cotherm type TSE GCS31 Motorised Valve GCS16 Expansion Vessel 19 litre nominal 170 200 250 models 18 litre actual vol 3 4 BSPM connection GCS24 Expansion Vessel 24 litre nominal 300 model 22 litre actual vol 3 4 BSPM connection GCS25 Expansion Vessel 35 litre nominal 400 model 35 litre actual vol 3 4 BSPM connection GCS28...

Страница 28: ...ctrician 3 When a hot tap is turned on there may be a short surge of water this is quite normal with unvented systems and does not mean there is a fault 4 When you first fill a basin the water may sometimes appear milky This is due to very tiny air bubbles in the water which will clear very quickly If water is seen to flow from either the Temperature Pressure Relief T P Valve valve or the Expansio...

Страница 29: ...chase date must be provided upon request Chargeable Repairs A charge will be made if the cause of the breakdown is due to any of the following Faults caused by the plumbing or heating system external electrics and external components The Grant Cylinder has not been commissioned or serviced in accordance with the installation and servicing manual The system has been installed for over two years Rem...

Страница 30: ...s period you will have the opportunity to continue this cover on an annual basis To access full details and an application form for this extended cover first visit www grantuk com Follow the links to the Householder Zone register your Cylinder for a further one year product warranty giving two years from the date of purchase and then download the extended warranty details and application form Plea...

Страница 31: ...Notes 31 Notes ...

Страница 32: ...GRANT ENGINEERING UK LTD Hopton House Hopton Industrial Estate Devizes Wiltshire SN10 2EU Telephone 01380 736920 Fax 01380 736991 Email info grantuk com Website www grantuk com ...

Отзывы: