6 - COMMISSIONING
20 Replace the casing panels, if not already fitted.
Note: After commissioning the boiler you should
complete the Commissioning Report on page 2 of
main instructions supplied with the boiler.
If the boiler is to be left in service with the User, set
the controls, timer (see User's Operating manual) and
room thermostat (if fitted) to the User's requirements.
If the boiler is not to be handed over immediately,
close the boiler fuel supply valve and switch off the
electricity supply.
If there is any possibility of the boiler being left during frost
conditions, then the boiler and system should be drained.
For details of servicing and Replacement of components,
Fault finding refer to the main instruction manual.
7 - INFORMATION FOR THE USER
The User must be advised (and demonstrated if
necessary) of the following important points:-
1
How to light and turn off the boiler and how to
operate the system controls.
2
The precautions necessary to prevent damage to
the central heating system and to the building, in
the event of the boiler not being in operation
during frost conditions.
3
The importance of servicing the boiler to ensure
safe and efficient operation. This should normally
only be required once a year.
4
The type of fuel used.
5
That any servicing or replacement of parts must
only be carried out by a suitably qualified engineer.
6
Ensure that the boiler controls and room thermostat
(if fitted) are set to the User's requirements.
7
Tell the user the system pressure and show them
the position of the safety valve discharge pipe.
8
Show the User how to reset the overheat thermostat
and how to restart the boiler if it goes to 'Lock-out'.
Leave these instructions and the main instruction
manual with the User.