4 - BOILER INSTALLATION

1

If the boiler is to be fitted against the wall, prepare the
wall to accept the heating system pipework. To mark
the wall for drilling, refer to Fig. 1 for the positions of
the pipework openings in the enclosure sides.

Note: Pipework should be insulated where it
passes through the wall into the boiler enclosure.

2

The electrical supply to the boiler should be
routed through the wall in a suitable conduit,
such that it enters the boiler enclosure via one of
the pipework openings. The cable can be routed
to the front of the boiler, for connection to the
boiler control panel, either over the top or
beneath the boiler heat exchanger. Heat resistant
PVC cable, of at least 1.0 mm² cross section
should be used within the boiler enclosure.

3

The oil supply line should be installed up to the
position of the boiler. Refer to the main installation
and servicing manual for details. The final connection
into the boiler enclosure can be made with 10 mm soft
copper, routed along the base of the enclosure (either
between the enclosure and wall or in front of the
enclosure) to enter through one of the holes located in
the bottom edge of either side panel, at the front
(burner) end.

4

A remote sensing fire valve must be installed in the
fuel supply line a minimum of 1 metre from the point
of entry to the boiler, with the sensing head located
above the burner using the clip mounted on the
underside of the control panel.

Preparations for installation

4.2

Conventional flue

4.3

Where it is not practical to use the factory supplied
low level flue, the Grant range of Outdoor Modules
may be fitted with a conventional flue system.

A twin wall stainless steel insulated flue system is
available from Grant UK.

An insulated boiler connector elbow, complete with
test point, replaces the low level terminal and flue
guard supplied with the boiler.

The Grant External flue system connects to the elbow
and may terminate at high level or vertically as
required. See Fig. 5.

The flue system is suitable for use with class C2
kerosene and class D gas oil.

When using gas oil the flue must terminate a
minimum of 2 metres above outside ground level.

The following components are available from Grant UK.

Item

Starter elbow

150 mm extension

250 mm extension

450 mm extension

950 mm extension

195-270 mm adjustable extension

45° elbow

High level terminal

Vertical terminal

wall bracket

Extended wall bracket kit

Part No.

GKM90

GX150/90

GX250/90

GX450/90

GX950/90

GXA250/90

GE45/90

GTH90

GTV90

GWB90

GEB90

Содержание Combi 90

Страница 1: ...allation of the boiler pipework electrical wiring and associated controls For information on servicing the boiler including burner fault finding repair and servicing please refer to the Combi 70 and C...

Страница 2: ...s Set both the burner and pump switches to OFF To restart simply set both switches to ON For long periods Set both the burner and pump switches to OFF If required the fuel supply valve may be closed a...

Страница 3: ...3 Combi 90 Outdoor Module 1 USER INSTRUCTIONS Fig A Fig 1 Boiler dimensions 2 1 2 BOILER TECHNICAL INFORMATION...

Страница 4: ...recommended mains water inlet pressure Combi 90 40 8 8 202 445 27 6 94 200 Flow 22 mm copper pipe Return 1 BSP 15 mm copper pipe 15 mm copper pipe 15 mm copper pipe 75 to 85 C 111 C 3 C 1 0 bar 0 5 ba...

Страница 5: ...quired A Conventional external stainless steel flue system is available for use with kerosene or gas oil The temperature of the water leaving the boiler to heat the radiators may be adjusted using the...

Страница 6: ...with the boiler Once the boiler is switched on it will always provide domestic hot water upon demand The timer only controls the operating times of the central heating When central heating is not requ...

Страница 7: ...on 6 The supply of hot and cold mains water direct to a bidet is allowed subject to local Water Undertaking requirements provided that the bidet is of the over rimflushingtype Theoutletsshouldbeshroud...

Страница 8: ...pump and Combi boiler components 5 The flue terminal must be a minimum distance of 1 8 m from an oil storage tank The flue terminal should be positioned so as to avoid products of combustion accumulat...

Страница 9: ...the boiler 4 1 Pipework materials 3 10 4 BOILER INSTALLATION Underfloor systems Plastic pipe may be used on underfloor systems where the plastic pipe is fitted after the thermostatic mixing valve Cop...

Страница 10: ...ge of either side panel at the front burner end 4 A remote sensing fire valve must be installed in the fuel supply line a minimum of 1 metre from the point of entry to the boiler with the sensing head...

Страница 11: ...11 Combi 90 Outdoor Module 4 BOILER INSTALLATION Fig 5...

Страница 12: ...position inside the house where the gauge will be visible to the User see Fig 7 Fit the double check valve to the mains water supply ensuring correct flow direction as indicated by the arrow on the va...

Страница 13: ...system must be connected to terminal 1 on the 12 way terminal block marked S L Note When connected in this way a link must be added between terminals 2 and 3 marked S L2 and L3 to enable the burner t...

Страница 14: ...d 3 If a room thermostat is fitted it must be wired in series with the time control and the boiler terminal S L 1 10 Set the left hand rocker switch to OFF check that the heating goes off and that the...

Страница 15: ...m thermostat is fitted it must be wired between terminal 1 on the Grant Mini Programmer and the boiler terminal S L 1 Grant programmable room thermostat 5 4 A programmable room thermostat Part No RSKI...

Страница 16: ...d replace the plug in the pump 11 Having ensured that there are no oil leaks replace the burner cover 12 Relight the boiler and allow it to run for 20 minutes then check the following CO2 level Flue g...

Страница 17: ...r must be advised and demonstrated if necessary of the following important points 1 How to light and turn off the boiler and how to operate the system controls 2 The precautions necessary to prevent d...

Страница 18: ...Combi 90 Outdoor Module 18...

Страница 19: ...19 Combi 90 Outdoor Module...

Страница 20: ...manual is accurate at the date of printing but will be superseded and should be disregarded if specifications and or appearances are changed in the interests of continued product improvement All good...

Отзывы: