background image

46

16.1 the Vortex Oil Boiler
Guarantee

You are now the proud owner of a Grant 
Vortex condensing boiler from Grant 
Engineering (UK) Limited which has been 
designed to give years of reliable, trouble 
free operation.
Grant Engineering (UK) Limited guarantees 
the manufacture of the boiler including all 
electrical and mechanical components 
for a period of 

twelve months from the 

date of installation

4

, provided that the 

boiler has been installed in full accordance 
with the installation and servicing 
instructions issued. 
This will be extended to a total period of 

two years

 if the boiler is registered with 

Grant Engineering (UK) Limited 

within 

thirty days of installation

 and it is 

serviced at twelve month intervals

3

. See 

main Terms and Conditions below.

registering the product with Grant 
Engineering (UK) Limited

Please register your Grant Vortex 
condensing boiler with Grant Engineering 
UK Limited 

within thirty days of 

installation

. To do so visit www.grantuk.

com, where you can register your boiler 
for a further 

twelve months

 guarantee 

(giving 

two years

 from the date of 

installation

4

). This does not affect your 

statutory rights

1

.

if a fault or defect occurs within the 
manufacturer’s guarantee period

If your boiler should fail within the 
guarantee period, you must contact Grant 
Engineering (UK) Limited who will arrange 
for the repair under the terms of the 
guarantee, providing that the boiler has 
been correctly installed, commissioned 
and serviced (if the appliance has been 
installed for more than twelve months) 
by a competent person and the fault is 
not due to tampering, running out of oil, 
oil contamination, debris, system water 
contamination, misuse, trapped air or 
the failure of any external components 
not supplied by Grant Engineering (UK) 
Limited, e.g. fire valve, motorised valve, 
etc.

this two year guarantee only applies 
if the boiler is registered with Grant 
Engineering (UK) Limited within thirty 
days of installation

4

 and is serviced 

after twelve months

3

.

in the first instance

Contact your installer or commissioning 
engineer to ensure that the fault does not 
lie with the system components or any 
incorrect setting of the system controls 

that falls outside of the manufacturer’s 
guarantee otherwise a service charge 
could result. Grant Engineering (UK) 
Limited will not be liable for any charges 
arising from this process.

if a fault covered by the 
manufacturer’s guarantee is found

Ask your installer to contact Grant 
Engineering (UK) Limited Service 
Department on +44 (0)1380 736920 
who will arrange for a competent service 
engineer to rectify the fault.

remember - before you contact Grant 
Engineering (UK) Limited:

• 

Ensure the boiler has been installed, 
commissioned and serviced by a 
competent person in accordance 
with the installation and servicing 
instructions. 

• 

Ensure there is oil to supply the 
burner.

• 

Ensure the problem is not being 
caused by the heating system 
or its controls. Consult the boiler 
handbook for guidance.

Free of charge repairs

During the two year guarantee period 
no charge for parts or labour will be 
made provided that the boiler has been 
installed and commissioned correctly 
in accordance with the manufacturer’s 
installation and servicing instructions, it 
was registered with Grant Engineering 
(UK) Limited within thirty days of 
installation

4

 and, for boilers over twelve 

months old, details of annual service is 
available

3

The following documents must be made 
available to Grant Engineering (UK) Limited 
on request:

• 

Proof of purchase

• 

CD10 Installation Completion Form 
(or equivalent document)

• 

CD11 Commissioning Report Form 
(or equivalent document)

• 

Service documents (CD11 or 
equivalent document)

Chargeable repairs

A charge may be made (if necessary 
following testing of parts) if the 
breakdown is due to any fault(s) caused 
by the plumbing or heating system, 
e.g. contamination of parts due to 
system contamination, sludge, scale, 
debris or trapped air. Refer to ‘Extent of 
manufacturer’s guarantee’.

Extent of manufacturer’s guarantee:

The manufacturer’s guarantee does NOT 
cover the following:

• 

If the boiler has been installed for 
over 

two years

.

• 

If the boiler has not been installed, 
commissioned, or serviced by a 
competent person in accordance 
with the installation and servicing 
instructions.

• 

Instances where the serial number 
has been removed or made illegible.

• 

Fault(s) due to accidental damage, 
tampering, unauthorised adjustment, 
neglect, misuse or operating the 
boiler contrary to the manufacturer’s 
installation and servicing instructions.

• 

Damage due to external causes such 
as bad weather conditions (flood, 
storms, lightning, frost, snow, or ice), 
fire, explosion, accident or theft.

• 

Fault(s) due to incorrectly sized 
expansion vessel(s), incorrect vessel 
charge pressure or inadequate 
expansion on the system.

• 

Fault(s) caused by external electrics 
and external components not 
supplied by Grant Engineering (UK) 
Limited.

• 

Problems caused by lack of oil or 
faults with the oil storage and supply 
system.

• 

Fault(s) due to contamination of the 
oil storage and supply system, e.g. 
water or debris.

• 

Bleeding or removing oil storage tank 
contamination or blockages from oil 
lines.

• 

Problems due to the flue system 
being incorrectly fitted or not installed 
to meet installation requirements.

• 

Boiler servicing, de-scaling or 
flushing.

• 

Cleaning out condensate traps/
discharge pipes or thawing out 
frozen condensate pipework. 

• 

Checking and replenishing system 
pressure. 

• 

Oil supply pipelines, electrical cables 
and plugs, external controls not 
supplied by Grant Engineering (UK) 
Limited.

• 

Heating system components, such 
as radiators, pipes, fittings, pumps 
and valves not supplied by Grant 
Engineering (UK) Limited.

• 

Instances where the oil boiler has 
been un-installed and re-installed in 
another location.

• 

Use of spare parts not authorised by 
Grant Engineering (UK) Limited.

• 

Consumable items including, but 
not limited to, oil nozzles, oil hoses, 
gaskets and seals.

16

 Guarantee

Содержание Combi 21e

Страница 1: ...UK DOC 0089 Rev 1 0 November 2016 Grant UK Pro External Combi Combi 21e Combi 26e and Combi 36e Condensing Oil Boiler Range Installation and Servicing Instructions...

Страница 2: ...only bio kerosene B30K that conforms to OPS24 IMPORTANT Under no circumstances should the boiler be used with bio kerosene without the above actions being taken first Date Commissioning engineer Tel...

Страница 3: ...pection and Cleaning of Trap 18 7 Sealed Systems 19 7 1 System Models 19 8 Electrical 20 8 1 Connecting the Power Supply 20 8 2 Connecting the Controls Heating Only 22 8 3 Connecting the Controls Heat...

Страница 4: ...ctly concerned with the surrounding text but of importance to the reader 1 1 How a Condensing Boiler Works During the combustion process hydrogen and oxygen combine to produce heat and water vapour Th...

Страница 5: ...r lights Overheat reset button under black cap Expansion vessel Heating CH pump Hot water DHW pump IMPORTANT CABLE TO PLUG MUST BE SECURED IN CABLE CLAMP BELOW PANEL MAXIMUM CABLE LENGTH BETWEEN PLUG...

Страница 6: ...Minimum recommended mains water inlet pressure bar 2 5 Condensate connection mm 22mm plastic pipe Flue diameter conventional 100mm 4in diameter Waterside resistance T 10 C mbar 28 5 26 0 Waterside re...

Страница 7: ...the boiler is supplied with a combustion test point on the front cleaning door When this test point is used please note the following The test point is for CO2 and smoke readings only The boiler effic...

Страница 8: ...d to BS 799 5 1987 and OFS T200 A galvanised tank must NOT be used A plastic tank may be used and must comply with OFS T100 Plastic tanks should be adequately and uniformly supported on a smooth level...

Страница 9: ...ll pipe Sludge valve Shut off valve Shut off valve Level gauge Filter Fuel storage tank Pump see section 3 2 Pump see section 3 2 Fire valve Fire valve sensor Vent pipe Fill pipe Sludge valve Non retu...

Страница 10: ...ertically as shown in Figures 3 3 and 3 4 To be used with a Tiger Loop system the burner must be fitted with an additional flexible fuel line a flexible fuel line 900mm and 3 8 to 1 4 BSP male adaptor...

Страница 11: ...lows 1 Remove the plastic burner cover two screws 2 Remove and discard the blanking plug from the return connection of the pump and fit the By pass screw using a hexagonal key 3 Connect the return oil...

Страница 12: ...izontal Rear Exit The flue must discharge away from the building Side Exit The flue should discharge towards the rear of the casing to prevent flue gases reentering the boiler casing through the air i...

Страница 13: ...X Pro External Combi e must be in accordance with the following recommendations Building Regulations for England and Wales and the Building Standards for Scotland issued by the Department of the Envir...

Страница 14: ...e use of a proprietary cleaner such as Betz Dearborn s Sentinel X300 or X400 or Fernox Restorer Full instructions are supplied with the products but for more details of Betz Dearborn s products view t...

Страница 15: ...r to leave the pipe ends with a slight radius and free from any burrs or sharp edges Pipes to be used with these fittings should not be cut square using a hacksaw CAUTION A drain tap is provided at th...

Страница 16: ...attached Arrangements for antisyphonage are not necessary If the hardness reading is found to be in the medium to very hard range the shaded area it is essential that some form of water conditioner o...

Страница 17: ...ll towards the point of discharge either internally into a waste system or externally to a gully e g for boilers installed in a basement it will be necessary to use a condensate pump Condensate dispos...

Страница 18: ...penings in both the sides and base of the casing These are designed to allow pipework to pass through the casing as required to suit the installation These openings can be used to allow the condensate...

Страница 19: ...ion if required If thermostatic radiator valves are fitted to all radiators a system by pass must be fitted The bypass must be an automatic type Provision should be made to replace water lost from the...

Страница 20: ...of the plug Refer to Sections 8 3 and 8 4 for details of controls wiring BEFORE making connections to the isolating plug 4 Replace the cover on the plug refit the two screws and ensure it is securely...

Страница 21: ...ection boiler top bracket Limit Thermostat Earth post control panel chassis Service switch G Y G Y 2 C 8 2 Connecting the Controls Heating Only To control the central heating on off periods only and n...

Страница 22: ...llows Connect the switched live output from terminal C of the programmable room thermostat to terminal L1 of the boiler isolation plug Fit a link between terminals L2 and L3 in the isolation plug Refe...

Страница 23: ...External Combi boiler Refer to Figure 8 4 for connection details To connect the FM 2 receiver unit to the boiler proceed as follows 1 Remove the boiler front casing panel 2 All electrical wiring is ma...

Страница 24: ...8 5 Connect the mains supply to the boiler isolation plug as follows refer to Figure 8 5 Permanent live to terminal L3 Neutral to terminal N Earth to earth terminal If an alternative two channel progr...

Страница 25: ...trol panel in cross member Hinge down control panel front 3 From rear of control panel carefully feed the cable from the Frost thermostat through the upper grommet at the right hand end of the rear of...

Страница 26: ...r balcony level 300 H From a surface or boundary facing the terminal 600 2500 J From a terminal facing the terminal 1200 K Vertically from a terminal on the same wall 1500 L Horizontally from a termin...

Страница 27: ...r the VORTEX range of condensing boilers The internal flue and liner diameter for all combi models must be 100mm 4 in The maximum vertical height from the top of the boiler to the terminal for the Ora...

Страница 28: ...9 6 Air Supply A permanent air supply must be provided to the burner sufficient to ensure proper combustion of fuel and effective discharge of combustion products to the open air The ventilation open...

Страница 29: ...urn the handle and withdraw it forwards at the bottom The controls are shown in Figure 10 1 Figure 10 2 Vortex Pro Combi 21e boiler with front panel removed showing position of control panel Figure 10...

Страница 30: ...he oil pump is running Note that the neon lights when the boiler is switched on but does not necessarily indicate the burner is firing 3 Fully open a hot tap and allow it to run for a few moments to v...

Страница 31: ...ed to protect the system against the effect of corrosion 3 A suitable antifreeze should be used to prevent damage to the boiler in areas where electrical power failure can occur in winter months 4 Rep...

Страница 32: ...side of the burner and reassemble in reverse order 10 7 Information for the User The User must be advised and demonstrated if necessary of the following important points How to start and switch off t...

Страница 33: ...ch to Off isolate the electricity supply and close the fuel supply valve Allow the boiler to cool The data label on the inside of the case side panel will indicate the fuel used and the nozzle fitted...

Страница 34: ...Baffles in Vortex Pro Combi 21e Figure 11 4 Turbulators in Vortex Pro Combi e boilers Figure 11 3 Baffles in Vortex Pro Combi 36e Important The ends of the turbulators must be vertical Turbulators Bo...

Страница 35: ...The use of an ill fitting spanner will damage the nozzle and could lead to an incorrect flame pattern 9 Always check the electrode settings after replacing the nozzle see Figure 11 5 10 Refit the com...

Страница 36: ...m Check Heating System water pressure Re fill system to increase pressure to between 0 5 and 1 0 bar If Burner Still Fails to Light Follow the BURNER NOT OPERATING procedure in Section 12 2 C For Hot...

Страница 37: ...g voltage Check for 230V at the pump terminals to the CH pump but Check if CH pump is stuck pump is not working Check for Rotation of shaft impeller If stuck Rotate shaft manually to restart If still...

Страница 38: ...no anti scale protection has been installed Refer to Section 5 for further details If plate heat exchanger is OK Check flow switch is correctly positioned the arrow on flow switch body must point in d...

Страница 39: ...Burner Fault Finding B No Hot Water but Central Heating OK continued Is the DHW PUMP YES Check electrical connections at the pump indicator lit PCB is supplying voltage to Check for 230V at the pump...

Страница 40: ...ow rate poor hot water Combi 26e 15 ltrs min maximum Combi 36e 18 ltrs min maximum Water Pressure Excessive pressure has a major Check standing and operating water pressure influence on flow rate 2 ba...

Страница 41: ...ive coupling broken Check oil pressure regulator No No No No OK Repair or replace oil pump Replace coil and or stem valve Photocell sound Coil of solenoid sound Motor gives 50 Volts to white wire Repl...

Страница 42: ...Riello RDB burner as used in the Grant VORTEX Pro Combi 21e 26e and 36e boilers and the associated parts list follows the figure 2 8 3 4 5 6 13 13 25 24 21 20 18 19 14 15 16 10 9 31 11 12 17 23 22 30...

Страница 43: ...rode bracket 3006552 RBS29 21 Flexible hose 3007672 RBS36 6 Nozzle holder 3008642 RBS111 22 Tube 3008644 RBS113 7 Collar 3008643 RBS112 23 Pressure gauge connector 3008876 RBS138 8 High voltage lead 3...

Страница 44: ...t and adhesive Known Hazards Irritation to eyes Precautions Avoid inhalation of vapour contact with eyes and prolonged or repeated contact with skin After handling always follow normal good hygiene pr...

Страница 45: ...89 336 EEC 73 23 EEC 92 42 EEC In EU Countries The following information is provided to enable regulatory compliance with the European Union EU directives identified and any amendments made to these...

Страница 46: ...roblem is not being caused by the heating system or its controls Consult the boiler handbook for guidance Free of charge repairs During the two year guarantee period no charge for parts or labour will...

Страница 47: ...ed to settle for an hour before restarting the boiler Terms of manufacturer s guarantee The Company shall mean Grant Engineering UK Limited The boiler must be installed by a competent person and in fu...

Страница 48: ...internal Hot Water pipework of the boiler The Heating pump will have a Black cable whilst the Hot Water pump will have a White cable To disconnect the plug Check that the power to the boiler is switc...

Страница 49: ...on N A Flashes Red and Green Pump is operating but stopped Pump restarts by itself after fault has disappeared Undervoltage Voltage 160V OR Overvoltage Voltage 253V Check supply voltage is 195V V 253V...

Страница 50: ...red load profile XL XL XL Daily electricity consumption Qelec 0 293 0 23 0 205 Annual electricity consumption AEC 65 4 50 5 45 2 Useful efficiency Seasonal space heating energy efficiency s 90 81 91 7...

Страница 51: ...Notes 51...

Страница 52: ...Notes 52...

Страница 53: ...53...

Страница 54: ...between 0 5 to 1bar If the heating system loses pressure on a regular basis then contact your Installer to investigate the cause Burner Lock out reset button If there is a burner malfunction a built i...

Страница 55: ...ent in the primary store The burner will not fire and so the heat in the store will gradually be used up and the hot water temperature will reduce with time If a 2 channel programmer is fitted the Hot...

Страница 56: ...ly to the boiler If required the fuel supply valve may be closed and the water and electrical supplies turned off at the mains To re start the boiler refer to the full lighting instructions above Figu...

Страница 57: ...ing special text formats are used in this manual for the purposes listed below Warning of possible human injury as a consequence of not following the instructions in the warning Note text Used for emp...

Страница 58: ...ise the System by adding Water 7 General Notes and Care of your System 7 Electricity Supply 7 Introduction 4 About your Boiler 4 Boiler Controls 4 About your Fuel 4 Lighting your Boiler 5 Turning off...

Страница 59: ...bility with bio kerosene B30K Where necessary some or all of these items may have to be replaced with a bio kerosene compatible alternative c Check the suitability of the flue system with Grant UK d U...

Страница 60: ...UK DOC 0089 Rev 1 0 November 2016 Grant UK Pro External Combi Combi 21e Combi 26e Combi 36e Condensing Oil Boiler Range User Instructions...

Отзывы: