
The set parameters can also be changed during operation.
Program execution
4.6.
Place samples on the platform. When loading arrange symmetrically to the turning axis to give
the unit even balance during operation.
Caution!
Do not place any items between the platform and the shaker body as this could cause
breakage or injury.
4.7.
Press the RUN key (Fig. 1/
z
). The platform will start
rocking
and the timer indicator will start
counting up the time interval (with 1 min precision).
4.8.
If the platform is overloaded
, the
operation process tries to restart rocking three times
(indication: DRIVER ERROR), if this operation fails
,
the display shows the flashing reading
OVERLOAD accompanied by the repetitive sound signal until the STOP key (Fig. 1/
{
) is
pressed. Eliminate the causes of overload before restarting operation (see p. 4.6).
4.9.
After the set time elapses the platform motion stops and the timer shows the flashing reading
STOP accompanied by the repetitive sound signal until the STOP key is pressed.
4.10.
If necessary the unit can be stopped at any time during operation before the set time has
elapsed by pressing
the
STOP key. In this case th
e
platform motion stops when the platform
achieves horizontal position. Pressing
the
RUN key again will start the program from the
beginning (timer will be restarted).
4.11. At the end of operation disconnect the external power supply unit from the mains.
Page 8
Platform Rocker PMR-100
Operating instructions
Version
1.02
-
April
20
1
3