![Grandview Large Stage MAIII Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/grandview/large-stage-maiii/large-stage-maiii_installation-manual_2256440002.webp)
Screen structure
Left hanging plate
screen center
fabric center
Middle Hanging
Right Hanging plate
Casing
Fabric
lower bar
unit
:
mm
Accessories
Shackle(3)
Warranty Card (1)
Instruction manual (1)
Motor adjustment tool (1)
Concrete ceiling
suspension distance
Hook
Reserved on the left
>1000mm
Installation method and attention
Optional accessories
Screw fixed hanging
plate M8*30
Screw bolt
Non-slip nut M8
Screen hidden installation location
Casing side view
205
102.5
16
38
26
0
222
≥
80
≥
80
≥
20
0
Weight
bearing
Weight
bearing
Anti-
falling
≤
200
≤
200
Screw fixed hanging plate
M10screw rod
205
106
10
50
50
Note: Due to structural reasons, the position of the screen is not the center of the screen,
but is offset to the right by about 81mm. This should be taken into account when
determining the location of the mounting hole; in addition, it is recommended to keep a
distance of 1 meter from the side of the screen power cord for future maintenance.
S
uspension
Installation
(standard configuration):
Measure the horizontal spacing of the hanging boards and the length of the product to
determine the installation position of the screen. Install a stable hook on a solid concrete
ceiling. It is recommended that the hook type be adjustable. (When the screen length is ≥
6m, 3 hangers are standard)
Hook the hooks on the shackles of the left, middle and right hanging plates respectively,
adjust the length of the hooks to the screen level, and complete the lifting;
(Note: the left and right hanging boards are the main stress points ,try to stay aside, and
the middle hanging boards are the secondary stress points)
Screw
rod
fixed hoisting (optional):
If the customer requires, you can purchase screw fixing hangers and accessories to fix the
screen; method: use M8 bolts and nuts to connect the screw fixing hangers to the outside
of the left and right hangers
Screw mounting: measure the distance between the four oblong holes on the left and
right hanging plates respectively, install M10 screw rods directly above the corresponding
holes to connect the left and right hanging plates, install an adjustable hook on the
middle of the screen to connect the middle hanging plate, and adjust the screws The
position of the screen to make the screen to a horizontal state, complete the installation
of the screen.
cycle key
cycle key function
power cable
Down
Up
Stop
Stop
8 7 6 5 4 3 2 1
Connection
port line
number
Features
RS485-B
RS232-GND
RS485-A
RS232-TXD
1
2
3
4
Up
Stop
5
Down
6
7
8
Public line
Screen control function description
Intelligent electric screen has 4 control methods:
A. Manual control (cycle button)
B. Wireless control
C. Dry contact control
D. RS485 or RS232 control
Manual cycle key control
The manual cycle button is at the left end of the
screen shell (near the interface), and the function
is to cycle through up, stop and down.
Dry contact, RS485 or RS232 control:
Crystal head interface definition diagram: