INTERIOR ROOF SUPPORT ASSEMBLY
7.1
Attach the L08E-X to the upper roof section
as shown with S04/ML01 fasteners already in
place where the 607 meets the 601B, and the
609 and the 602B meet see , repeat this on
the front section of the greenhouse, and where
extensions meet at the AZ-1.
7.2
Attach the L08D-X to the rear lower roof
section where S04/ML01 fasteners are already
in place where the 609 and the 602B meet, and
the 609 and the 601B meet see , repeat on
the front section, and where the extensions
meet the AZ-1.
7.3
Attach the BZ-1’s to the roof line as shown
in diagram with the S04/ML01. The edge of
the BZ-1 should meet up to the edge of 609
exactly.
7.4
Use CZ-1’s to support the interior wall at
the eave using the S04/ML01. See diagram .
We suggest that you measure down 9” and mark
it with a pencil so the base of the CZ-1 will meet
there.
You may remove all stickers now with Goo
Gone remover if needed.
L08E-X
L08D-X
L08D-X
CZ-1
CZ-1
BZ-1
9”
9”
L08D-X
L08E-X
BZ-1
CZ-1
602B
607
609
Roof
Vent
602B
601B
601B
609
609
607
60
STEP SE
VEN
601B
601B
Congratulations You Did It!!
Содержание GRANDIO ELITE 8x12 2015
Страница 71: ...NOTES NOTES 70 NOTES...