background image

MIDDLE ASSEMBLY CONTINUED

22

STEP F

OUR

4.7 

With 2 people, attach the ridge to front and back by sliding into place as 

shown in        and        , using S04/ML01 fasteners attach the 607 to the 601B’s 

as shown in        .

607

607

601B

Side Angle View

Outside View

607

601B

Inside View

601B

607

601B

Содержание GRA-812BR-GR

Страница 1: ...G R E E N H O U S E S GRANDIO GREENHOUSEUSERMANUAL 2013 Grandio Greenhouses Backyard Living Source Inc All rights reserved Model GRA 812BR GR 8x12 GRANDIO ELITE...

Страница 2: ...be covered on your policy Call your local utilities companies before digging Do not attempt to begin construction on a windy day Your greenhouse should be built on a at level surface allowing for drai...

Страница 3: ...otective film immedi ately after the construction is completed Clear lm side of panels should always face the sun and opal lm side faces inside Due to shipping the grooves of some of the aluminum prof...

Страница 4: ...and will be best protected from wind and storm conditions Go to www grandiogreenhouses com for founda tion ideas and tour our online learning center for tips and tricks for putting your greenhouse tog...

Страница 5: ...8A X L08C X L08C X 609 609 610 630 609 609 610 630 L08A 622 L 622 R 603C 603C L08C L08C X 603C 616 618 603C 616 618 L08C X L08C 623B 623B 623B 623B 606 606 606 606 606 606 606 606 Y7 Y7 Y7 Y7 Y7 Y7 Y7...

Страница 6: ...ASSEMBLY INSTRUCTION STEPS STEP ONE BASE ASSEMBLY STEP TWO FRONT ASSEMBLY STEP THREE BACK ASSEMBLY STEP FOUR MIDDLE ASSEMBLY STEP FIVE DOOR ASSEMBLY G R E E N H O U S E S GRANDIO 5...

Страница 7: ...cut for patio or deck installation Drill holes in bottom of base to allow for proper fastener to pass through prior to moving forward with assembly You determine and aquire proper fastener prior to in...

Страница 8: ...y to find a shady area protected from the wind Panels can burn grass and plants if in direct light 7 STEP TWO GRANDIO T I P We recommend watching our how to assembly videos with tricks and tips for ea...

Страница 9: ...crews provided see 2 3 Install WG02 s into 2 601B s then tighten S05 screws when extrusions are completely tight see Note the fat end of the WG02 will always be on the bottom side GRANDIO T I P BOLT I...

Страница 10: ...rs on both sides as shown in Y3 1 Y3 2 601B 601B 601B 601B 603E WG01 WG02 WG02 603D W04 W04 1 W04 1 S04 ML01 W04 603E 603D 9 STEP TWO W04 1 603D 601B GRANDIO T I P Transparent Film Outside Greenhouse...

Страница 11: ...you may use a screwdriver to wedge behind the bolt head This prevents bolt from falling into the track S04 601A FR ML01 619 INSIDE Inside View 601A FL 601A FR 604 R 604 L 619 INSIDE OUTSIDE INSIDE OUT...

Страница 12: ...w driver along edges gently stretching the 606 to allow room for panels to fit 2 9 Insert Y1 and Y2 polycarbonate panels into place make sure Y1 and Y2 slide com pletely into 606 as show in 2 10 Attac...

Страница 13: ...re front section loosen S04 ML01 attached to the bottom of the 2 604 s square the frame with carpenter square or use a measuring tape to make sure corner mea surements are the same tighten L08A X s to...

Страница 14: ...acement Inside View GRANDIO T I P Make sure the UV coated side of the panel faces outward as indicated on the panels Avoid placing the polycarbonate panels in the sun or near plants until fully assemb...

Страница 15: ...he WG01 into the 601B s as shown in diagram 3 3 Install WG02 s to connect 2 601B s when firmly placed between the extru sions tighten the S05 screws see GRANDIO T I P BOLT INSTALLATION TIP Locate all...

Страница 16: ...ing S04 ML01 fastener as shown in diagram 3 5 Attach the 4 606 s to the L08A as shown in 3 6 Insert the Y4 polycarbonate panels into the grooves of 601A 602D and 602C Make sure Y4 panels are inserted...

Страница 17: ...s in each 603C to the L08B and to each 601A B 602D and the 602C When aligned tighten the middle first and work your way outward See diagrams 3 8 Insert the Y5 1 and Y5 2 polycarbonate panels into plac...

Страница 18: ...WG01 into the 602C When all members are snug tighten all fasteners to lock into place BACK CONTINUED Y1 Y1 Y1 Y1 601A B 601A B 602C 602D 602D Y4 1 Y5 1 Y5 2 Y4 2 601B 601B 601B 601B 601B W04 2 W04 2 W...

Страница 19: ...s with fasteners as shown in GRANDIO T I P Square by loosening bolts attached to the tops of the L08B X use measuring tape to make sure corners to corner measures the same ML01 S04 603B L08B X L08A B...

Страница 20: ...P You will need a minimum of 2 people to complete the middle assembly of your greenhouse The more people the merrier at this stage of assembly 19 STEP FOUR Base W05 L08C Inside W05 Base 601A Front Sid...

Страница 21: ...and attach the L08C s to the front section as shown in Using tape temporarily attach the loose end of the L08C s to the base kit as shown in MIDDLE ASSEMBLY CONTINUED 20 STEP FOUR Tape Base L08C Mask...

Страница 22: ...and 4 5 Attach bottom of L08C X to L08C W05 and base as shown in Repeat steps for other side The L08C X braces will hold the front up vertically without assistance 4 6 To install the back section rep...

Страница 23: ...UR 4 7 With 2 people attach the ridge to front and back by sliding into place as shown in and using S04 ML01 fasteners attach the 607 to the 601B s as shown in 607 607 601B Side Angle View Outside Vie...

Страница 24: ...L01 nut and bolt See 2 Now move the loosened S04 ML01 nut and bolt currently attached to the 601A upward to firmly secure the L08C X 609 and 601A together as shown in 3 Repeat steps 1 and 2 for the ot...

Страница 25: ...g a S04 ML01 nut and bolt and W05 base clip as shown in Note Where the L08C X reattaches to the L08C and the 602A be sure to secure them with a W05 base clip to the base see 3 Repeat for the other sid...

Страница 26: ...m on both sides of the upper roof section Attach 1 602B between the 2 609 s on both sides of roof Do not attach remaining 602B s to lower roof section until roof vents are attached 4 13 Insert Y11 pan...

Страница 27: ...as you will need a 602B support to keep in window vent in place Place directly across from each other for best cross draft ventilation see for optional placement 4 16 Attach all remaining 602B s after...

Страница 28: ...4 18 Attach HQC01 to 616 with the screws see close roof vent and attach the handle onto HQC02 middle pin the first two holes of the handle to the first two holes of HQC02 Then attach HQC02 to 603 with...

Страница 29: ...ower roof of your greenhouse Panels may slide out before gutters are in place You may want to place a piece of tape on the panel to prevent sliding as shown below once the panels are in place 4 20 Sli...

Страница 30: ...nd back as shown below Squeeze a small amount of rubberized silicone or construction adhesive into the ends of ridge 607 to secure pressure fit end caps 601 As show in images on the right Use Z03 scre...

Страница 31: ...R ASSEMBLY DIAGRAM Z01 622 Y6 Y6 622 R UP UP Double Ball Catch 620 Z01 Z01 Z01 Z01 Z01 623B 623A 623B J04 J04 J04 622 Side View 622 J08A Bottom View 623B 620 623A J08A J08A 622 L UP UP Side View 622 J...

Страница 32: ...e 623B then attach 622 to the 623A and 620 using the Z01 screws as shown in 5 3 Insert Y6 windows into position as shown in make sure to match doors up to each by laying out parts for other door now s...

Страница 33: ...ach 622 to the 623A and 620 using the Z01 screws as shown in 5 6 Follow the same instructions for the other door making sure that the 622 L and 622 R with the double ball catch match up so doors will...

Страница 34: ...hanging door track with door header move bolts on L21 to line up with bolt holes on door header 603D From the inside attach the S02 nut and bolt set and tighten while holding firmly as high as possib...

Страница 35: ...he J04 rollers on the bottom track are catching or dragging you may need to adjust the height by turning the screw shown in 5 9 Attach the door handles 622 HNDL to both doors using the 622 HNDL NUT BO...

Страница 36: ...L21 and 601A as shown below in diagram and Attach 2 J07 to the ends of L21 see 5 11 Remove all plastic film from polycarbon ate window panels immediately at this step DOOR INSTALLATION J07 603A L21 L2...

Страница 37: ...609 and the 602B meet and the 609 and the 601B meet see repeat on the front section 5 14 Attach the BZ1 s to the roof line as shown in diagram with the ML01 S04 We suggest that you measure up 4 3 4 f...

Страница 38: ...ROOF 84 BACK 67 BACK 67 BACK 47 5 16 FRONT 21 7 8 ROOF 21 7 8 ROOF 17 FRONT 65 9 16 FRONT 65 9 16 FRONT QTY 2 1 1 8 6 10 12 20 1 1 1 1 8 12 1 1 1 PICTURE 607 609 610 630 619 L08A L08B L08C L08D L08A X...

Страница 39: ...CK 2 PHILLIPS SCREWDRIVER 4X30 5X12 MM 5X12 MM 3X25 MM 2 4 2 4 4 8 2 8 4 5 9 2 1 13 9 17 4 L08B X L08C X L08D X L08E X 620 L21 622 622 L 622 R 623A 623B J04 J07 J08A L28 ALL MODELS ALL MODELS ALL MODE...

Страница 40: ...OR MID BASE BACK PLATE MID BASE BACK PLATE BASE CLIP BASE CLIP CORNER ANCHOR DOOR DOOR 2 4 2 4 1 14 18 4 4 2 0 2 0 2 15 19 4 4 4 39 S02 S03 M01 ML01 S04 S05 JG01 JG02A B JG03A B B 1 CZ 1 ALL MODELS GR...

Страница 41: ...FRONT PANEL FRONT PANEL FRONT PANEL BACK PANEL BACK PANEL BACK PANEL BACK PANEL 6 1 1 1 1 1 1 1 1 Y6 Y7 Y8 Y9 Y10 Y11 ALL MODELS GRA 88 GRA 812 GRA 88 GRA 812 GRA 88 GRA 812 GRA 88 GRA 812 GRA 88 GRA...

Страница 42: ...NUAL KEEP IN A SAFE PLACE FOR REFERENCE CONTACT US IF YOU NEED HELP OR HAVE MISSING OR DAMAGED PARTS GRANDIOGREENHOUSES COM BACKYARD LIVING SOURCE INC 9543 W EMERALD ST SUITE 101 BOISE ID 83704 1 866...

Отзывы: