OPERATING THE CRAFT
48
MOTOR INSTALLATION
Information about motor trim is given for reference purposes only.
The engine manufacturer’s dealer or authorized agent should undertake installation of the motor
on your boat.
The optimum position is
with the propeller axis
parallel with the water.
Fig. 13. Optimum trim.
Содержание Golden Line G850
Страница 1: ...Not...
Страница 2: ...CONTENTS...
Страница 3: ......
Страница 4: ...CONTENTS...
Страница 58: ...OPERATING THE CRAFT 58 LOCATION OF BILGE PUMP Fig 22 Bilge pump location Bilge pump...
Страница 66: ...OPERATING THE CRAFT 66 ANCHOR LOCKER AND BOW LOCKER COMPARTMENT Fig 30 Anchor locker and bow locker compartment...
Страница 68: ...OPERATING THE CRAFT 68 WASH BASIN OF THE HATCHED COMPARTMENT Fig 32 Wash basin Overboard discharge valve...
Страница 70: ...OPERATING THE CRAFT 70 WATER SYPPLY SYSTEM IF APPLICABLE Fig 34 Water supply system...
Страница 76: ...OPERATING THE CRAFT 76 REAR SIDE ROPE HATCHES Fig 38 Rear side rope hatches Rope hatches...
Страница 99: ...TECHNICAL DETAILS 99 Golden Line G850 Owner s Manual GENERAL VIEW OF A BOAT Fig 54 General view of a boat...
Страница 100: ...TECHNICAL DETAILS 100 LOADING PASSENGERS Fig 55 Recommended seating arrangement for 12 persons...
Страница 101: ...TECHNICAL DETAILS 101 Golden Line G850 Owner s Manual ELECTRICAL SCHEMATIC DIAGRAM Fig 56 Electrical schematic diagram...
Страница 115: ...FOR YOUR NOTES...
Страница 116: ......
Страница 117: ......