GRAND Golden Line G340, G340L, G340GL
UM13400
PREPARATION FOR EXPLOITATION
1 Unpack the boat and unfold the inflatable tube.
2 Set all valves in the operation condition (look below).
3 Install the back of molded-in helm seat (see Fig. 1):
- insert seat-back support into the holes of overhead seating part;
- fix seat-back by means of the shaped bolts M6x40, shaped
washers, washer and arrester nuts M6 from the complete set.
4 Mount the steering cable:
- mount the outboard engine on the transom in accodance with it's
own installation instruction (User's manual of your outboard
engine);
- put steering cable in to the steering mechanism case;
- install the steering mechanism case on available fastener holes;
- fix steering mechanism by means of the accompanying fasteners.
5 In order to install the steering console, perfom the next operations
- mount the block of remote control on the right side of the steering
console;
- connect electric cable to the steering console (see wiring diagram);
Fig. 1
Fig. 2
3
5
6
1
2
7
4
Pos
Item
1
Bolt
2
Bush
3
Windscreen
4
Washer #1
5
Steering concole
6
Washer #2
7
Nut