5
GrandCanyonGasLogs.com
STEP BY STEP INSTALLATION
This Battery Electronic control system must be installed by a qualified gas
professional. These instructions MUST be followed to ensure proper performance
and safety. Failure to do so could result in serious injury or death.
Battery electronic valve system is shipped pre-assembled with fittings and heat shields already attached.
For systems ordered “Assembled” the valve system is pre-assembled and tested at the factory before shipping.
Perform the installation with extreme care ensuring not to damage the valve, module or wiring harness
connections. It is also recommended that the valve assemble is performed outside of the fireplace.
Pre-Installation –
For assembly of control system to an existing gas log system, ensure that all the media has been removed and
the burner is clear of all dust and debris. Check to ensure that the valve system and burner are labeled for the
gas type supplied to the fireplace (Natural Gas or Propane). Also check to ensure that the proper gas pressure
is supplied to appliance (Minimum 5" W.C Natural Gas, Minimum 10" W.C Propane).
This Battery Electronic Control must be installed by a qualified professional
service technician. Instructions must be followed carefully when installing
to ensure proper performance.
These instructions must be used as a supplement to the instructions supplied with the Grand Canyon
Gas Logs burner system. Follow the burner system instructions and make adjustments as appropriate
for the addition of a battery electronic system. Use gas pipe sealing compound that is resistant to all
gasses (or Teflon tape) and apply to all male pipe connections. DO NOT apply pipe sealing compound
to any flare connections. Make sure that all connections are tight.
Installation –
Remove all burner components for the burner kit and
the valve control system parts. Locate the silver gas
control valve, (2) 3/8" FIP x ½" Flare brass elbows,
Velcro & green control module. Using pipe sealing
compound insert each of the brass fittings into the
valve tightly, with the connections facing the bottom
of the valve, Fig.1. Attach the green control
module to the valve as shown in the picture.
NOTE: Orient the valve so that the gas inlet is on the
right and the gas outlet is on the left. The gas outlet is
on the same side as the pilot assembly connection.
Gas In
Gas Out
Fig. 1