background image

29 

 

 

 

KLC-100 – Conforto Part List 

 
 

ITEM 

PART NUMBER 

DESCRIPTION 

QTY 

CAB-A0-0047-00 

Front Panel Assembly 

CAB-A0-0031-00 

Left Panel Assembly 

CAB-A0-0032-00 

Right Panel Assembly 

CAB-A0-0033-00 

Divider Panel Assembly 

CAB-A0-0046-00 

Base Panel Assembly 

CAB-P0-0022-00 

Top Rear Panel 

3HN-00-PULL-00 

Handle Flush Pocket Pull 

CAB-P0-0018-00 

Blower Door Panel 

CAB-P0-0248-00 

Upper Divider – Part 2 

10 

CAB-P0-0143-00 

Upper Divider 

11 

CAB-P0-0012-00 

Insulation Support 

12 

3CN-02-0375-00 

Tube Condensate Neutralizing 2GPH ½ NPT 

13 

CAB-P0-0246-00 

Condensing Backing Plate 

14 

3HC-12-COLL-00 

Collector Heat Exchanger 

15 

3GK-18-COLL-00 

Gasket Condensing Collector 3/16’’ HT Neoprene 

16 

HEX-A0-0008-00 

Pipe Baffle 1.5in Assembly 

20 

17 

INS-P0-0038-00 

Divider Filler Gasket – 20 Holes 

18 

HEX-A0-0002-00 

Condensing Heat Exchanger Assembly 

19 

3AF-02-1220-01 

Filter Air 12'' x 20'' x 2'' Non-Pleated (Strata Type) 

20 

INS-P0-0018-00 

Sight Glass Insulation 

21 

INS-P0-0017-00 

Burner's Flange Insulation 

22 

3SG-0P-1030-5A 

Glass Sight Clear 1'' NPT Hex With THD Seal 

23 

4SD-00-0215-00 

High Limit Snap Disc (215°)Auto R eset #36T01B7 47655 

24 

ELB-P0-0018-00 

Cover Electrical Box – Low Boy Model 

25 

ELB-A0-0022-00 

Electrical Box Assembly – Low Boy Condensation 

26 

4CB-00-FAN0-00 

ST9103A1028 Electronic Board

 

27 

4TF-00-40VA-00 

Transformer HTC-01A0BB01 40 VA 

28 

4RY-00-24V0-00 

Relay AE04001 24VAC Form C SPDT 24V 

29 

4RY-BP-0175-15 

Timer Bypass NC 15 Second Delay 

30 

4SW-PS-9370-55 

MPL NC Pressure Switch 0.55 inches 

31 

FAN-A0-0005-01 

Fan Motor Assembly KLC ECM Motor 

32 

3BU-12-07DD-00 

Blower DC 1220 Fwd-curved Direct Drive 

33 

3BM-50-ECM0-02 

Motor Blower ½ HP ECM Ecotech EMERSON 

34 

1SB-00-BUMR-02 

Bracket Long Motor Mounting Direct Drive Blower 

 
 
 
 

Содержание KLC-100

Страница 1: ...T MEET ALL LOCAL AND FEDERAL CODES THAT MAY DIFFER FROM THIS MANUAL Please read the manual in its entirety before beginning installation This manual must be kept with the furnace for future reference...

Страница 2: ...temperature probe in the flue pipe Upon completion of the test cover the hole with HVAC aluminum tape If the temperature is OVER 125 Degrees F 1 Check that ALL 20 baffles are in place To do this you...

Страница 3: ...ALLATION OF THE BURNER 13 5 2 SET BURNER FOR EFFICIENT OPERATION 14 5 3 TECHNICAL INFORMATION 16 6 0 FURNACE OPERATION AND SETTINGS 17 6 1 BLOWER SETTING 17 6 2 FAN TIMER CONTROL BOARD ST9103 A 1028 1...

Страница 4: ...E DO NOT TAMPER WITH THE FURNACE OR CONTROLS CALL A QUALIFIED BURNER TECHNICIAN DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPOURS AND LIQUIDS IN THE VICINITY OF THIS UNIT OR ANY OTHER APPLIANCE...

Страница 5: ...t capacity 3 0 tons Maximum air temperature rise See pages 16 and 31 High Limit temperature 215 F Thermostat anticipator See thermostat instructions MOTOR BLOWER KLC 100 1 2 hp ECM GT12 10 FAN HIGH LI...

Страница 6: ...2 x 12 x 20 x 2 non pleated UL approved PLENUM DIMENSIONS KLC 100 CONFORTO Cold air return A 20 x 20 508 x 508 mm Hot air supply B 20 x 20 508 x 508 mm Plenum spacing C 3 76 mm KLC 100 DIMENSIONS Dime...

Страница 7: ...eck for kinks in the oil lines as well as for possible air pockets and for loose connections Two filters as shown below are recommended Optional tank gauge protectors and outlet protectors are availab...

Страница 8: ...CREASE THE OUTLET TEMPERATURE A MODIFIED UNIT IS NO LONGER ENERGY STAR APPROVED THIS COULD RESULT IN FIRE HAZARD AND OR OTHER HAZARDOUS CONDITIONS THAT MAY LEAD TO BODILY HARM COMBUSTION Install openi...

Страница 9: ...tion of the installation must be used 3 3 INSTALLATION INFORMATIONS VENT PIPE See NFPA 31 USA or CSA B139 Canada code Breech is certified for 3 ULC IPEX S636 PVC 40 vent pipe in Canada and IPEX S636 P...

Страница 10: ...1 2 BF3 Riello burner approved Two small openings of 3 1 2 BF3 Riello burner approved Especially for retrofit installation Easy to fit one pipe in 7 x7 chimney tile Avoid wall opening No clearance res...

Страница 11: ...EARANCE TWO PIPES WALL CLEARANCE All piping must be on same wall 0utlet termination clearance above grade and roof overhang Check flue and combustion air pipes for any leak VENT TERMINATION WARNING It...

Страница 12: ...rain tube Floor drain or condensate pump reservoir BEWARE NOT TO CREATE A KINK IN THE CONDENSATE DRAIN TUBE IMPROTANT Floor drain Or condensate pump reservoir Please note that the warranty to this pro...

Страница 13: ...orten the unit life and may cause products of combustion to enter the house Wire as per wiring label and diagram Height of the coil above the unit supply shall be at least 4 102 mm See A C coil Manufa...

Страница 14: ...correct setting INSERTION MOUNT BURNER Tighten top nut first so burner tips down slightly The burner is always installed in an upright position by four 4 nuts PUMP BY PASS For one pipe system factory...

Страница 15: ...ed for the burner set up Drill 3 8 diameter hole on top of the vent pipe and use the supplied test port plug to seal after burner setup Rear Flue Furnace illustration COMBUSTION TEST All your tests mu...

Страница 16: ...band on the burner to reduce your CO2 lecture by 1 5 with a two pipes installation On a one pipe installation reduce your CO2 by 1 You now have a perfect 0 of smoke Relation between of CO2 and O2 CO2...

Страница 17: ...2 wc to 0 5 wc Temperature Rise F 52 85 58 85 52 85 58 85 Blower Speed MEDIUM MEDIUM MEDIUM MEDIUM Static Pressure Blower ECM 1 2 hp Speed 0 2 wc 0 5 wc HI 1300 1230 MHI 1225 1160 MED 1140 1050 MLO 1...

Страница 18: ...perates as usual OPERATION If the furnace system fails to operate or operates in an unusual manner call your service technician If the burner fails to operate at any time call a qualified burner techn...

Страница 19: ...m at the end of the heating cycle after the burner has turned off adjust the FAN OFF dip switch on fan timer control board Refer to the next figure FAN OFF Dip Switch Dip Switch adjustment 90 seconds...

Страница 20: ...Burner shuts down after call for heat is satisfied 5 Blower stops according to adjusted FAN OFF Dip switch selection ST9103 Cooling Sequence 1 Thermostat calls for cooling 2 Blower starts immediately...

Страница 21: ...l Yes Move to next step No Check for bad connection Yes Move to next step No Change Transformer 3 Electronic Fan control Check for 24 Volts between R and C Yes Move to next step No Change the electron...

Страница 22: ...Check for 120 Volts on the contact No of burner activation relay Yes Move to next step No Change the burner activation relay Check for 120 Volts on terminal 1 of the bypass timer relay 15sec Yes Move...

Страница 23: ...he electronic fan control Yes Check COOL speed on the blower motor No Change the electronic fan control 8 Condensing unit Check for 24 volts between terminal Y and C on the electronic fan control Yes...

Страница 24: ...31 for recommended servicing procedure Clean flue pipes on a regular basis Check flue and combustion air pipes for any leak CHANGING NOZZLE It is recommended that the nozzle be replaced once a year If...

Страница 25: ...alizer cartridge can be acquired from your local dealer During the first hours of operation The appliance self cleans its interior The result being that for the first 20 hours of activity the condensa...

Страница 26: ...ent 3 Disconnect the wiring to the blower motor 4 Remove the air filter and the condensate neutralizer 5 Remove the four 4 wing nuts securing the blower side to the base panel bracket 6 Slide the blow...

Страница 27: ...L WIRING DIAGRAM 8 1 HEATING COOLING The condensate overflow switch is inside the rear black plastic condensate collector It is a normally automatic reset contact NOTE 1 2 wires thermostat wiring diag...

Страница 28: ...27 8 1 HEATING ONLY The condensate overflow switch is inside the rear black plastic condensate collector It is a normally automatic reset contact...

Страница 29: ...28 9 0 EXPLODED PARTS VIEW KLC 100 CONFORTO Exploded Parts View...

Страница 30: ...r Gasket 20 Holes 1 18 HEX A0 0002 00 Condensing Heat Exchanger Assembly 1 19 3AF 02 1220 01 Filter Air 12 x 20 x 2 Non Pleated Strata Type 2 20 INS P0 0018 00 Sight Glass Insulation 1 21 INS P0 0017...

Страница 31: ...O BF 3________ Turbulator Air Gate Venting type installation Two pipe system______ Coaxial System ______ Vertical one pipe system ________ Smoke result 0 TRACE__________ Combustion Results CO2 Excess...

Страница 32: ...Supply Pressure Ps Return Pressure Pr A C Coil Total Resistance Reading A C coil total resistance Coil Pressure Pc Supply Pressure Ps Temperature Rise Reading Temperature rise Supply Temp Ts Return T...

Страница 33: ...Canada and the United States through a distribution network Our team of engineers designers and technicians continually research and develop products to go beyond the demanding specifications of today...

Отзывы: