
COMPACT-MULTI – INSTALLATION/OPERATION MANUAL
5IM-OF-K4C0-01
Jun/12
14
SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
FOR MOST RECENT UPDATES PLEASE VISIT
www.granbyindustries.com
.
The following form
MUST
be completed for the warranty to be valid.
Installed by:
Address:
Telephone:
Date:
START UP TEST RESULTS
Nozzle:
Pressure:
Air:
Turbulator:
CO
2
:
Smoke Number:
Breech Draft:
Stack Temperature:
Test Performed By:
Staple Printout Here:
Staple Smoke Spot Here: