
9
Pic. 3
Pic. 5
Pic. 5a
Pic. 5b
Pic. 4
A) Installation of ceiling connection plate
Front sticker (picture 3) on ceiling connection plate and control
panel of chimney hood should have the same direction.
1)Drill 10mm holes from A,B,C,D points.
2)Drive 10mm wall plugs in to A,B,C,D holes.
3)Fix ceiling connection plate to ceiling by using
4 screws (5,5 x 45).Wall plugs,screws and celing connection
plate are given with chimney hood - picture 3
B) Installation of cornerpieces:
Front sticker(picture 4) shows where front
side of chimney hood should be installed.
Front cornerpieces should be left and right
directions.Back cornerpieces should be
extroverted.Screw 4 cornerpieces to motor
block.Hanging bar should have same
directions with ceiling connection plate.
Regulating the legth of chimney hood with
these cornerpieces.
C) Installation of chimneys to motor
cabinet:
Please put internal chimney in extarnal
chimney.For temporary connection between
chimneys please use a screw on motor
cabinet.(So chimneys will not drop while
you install motor cabinet to ceiling connec-
tion plate.)Mount the chimneys on this
screw.(Screw holes of internal chimney
should befit the side of motor cabinet.)
Picture 5, 5a, 5b
Front bracket connec-
tion, left and right up
front
Back bracket connec-
tion, up-front
Assemblying
front surface
of body
Assembly
bracket
INSTALLATION
Содержание EFK 5490 Series
Страница 2: ...2 min 650mm Gas cookers 1a...
Страница 3: ...3 7 5 2a 4a 6 1 2 3 4 5...