06.
SETUP & CLEANING
• Unpack the fermenter and all parts, remove the protective packaging.
• Assemble the valve and beer inlet and attach the valve to the bottom of the fermenter by inserting the
ferrule seal, then using the tri clamp to tighten it. See page 9 for more information.
• Plug the 2 m (6.6 ft) power cord into the back of the fermenter.
• Plug the other end of this power cord into the power adapter, this then plugs into the wall, but do not
switch the power on at the wall until you want to heat the fermenter.
Содержание Conical Fermenter
Страница 1: ...Instructions Conical Fermenter...
Страница 5: ...14 15 16 17 18 19 20 22 23 21 glycol chiller fig 1...
Страница 12: ......
Страница 20: ...www grainfather com Reorder 72663 Version 2...