1. 

General notes 

1.1 

Safety 

The relevant accident prevention regulations according to BGV C22 have to be observed when 
conducting any works. Especially when inspecting tanks a second person is required for safety reasons. 

Furthermore, the relevant regulations and standards have to be observed during installation, assembly, 
maintenance, repair, etc. You will find information about this in the related sections of these instructions. 

During all works on the system respectively on system components the overall system has to be 
decommissioned and secured against unintentional restart at all times. 

The tank cover has to be closed at all times, except when conducting works on the tank, otherwise there 
is a very high risk of accident. Only original GRAF covers or covers approved by the company GRAF in 
writing are to be used. 

The company GRAF offers a comprehensive portfolio of accessories that are aligned with each other and 
can be developed into complete  systems. Using deviating accessories can lead to impairments of the 
functionality of the system and thus to the liability for damages resulting thereof expiring. 

1.2 

Identification obligation 

All lines and tapping points of process water have to be labelled with the words “

No drinking water

” in 

writing or visually (DIN 1988 part 2, section 3.3.2.) in order to avoid an accidental connection to the 
drinking water network even after years. Even when there are correct labels, irritations are possible, e.g. 
through  children. That is why all tapping points of process water have to be installed with 

child-proof

 

valves. 

 
 

2. 

Installation set up requirements 

2.1 

Assembly above ground 

 

The tanks must be installed on an appropriate level and compacted surface that is free from 

sharp objects and stones. 

 

Notice must be taken that the tanks when filled will weigh 1,350 kg 

 

When there is a danger of frost the tanks must be completely emptied. 

 

When the tanks are to be installed in a closed room, it is necessary to ensure that there is a floor 

drainage system. 

 

Children must be supervised in the vicinity of the containers. 

 
 

3. 

Transport and storage 

3.1 

Transport 

The transport of the tanks may only be undertaken with the appropriate transport machinery. During the 
transport the tanks are to be secured against slipping or falling.  If the tanks are secured for transportation 
with webbing straps, it is to be ensured that the tanks remain undamaged. Dragging or lifting the tanks 
with steel cables or chains is not permitted. 

Stress and excess loading caused by impact are to be avoided. Under no circumstances are the tanks to 
be rolled or slid over the ground surface. 

3.2 

Storage 

Any necessary temporary storage of the tanks must be on an appropriate level surface without sharp 
objects. During the storage it is important to avoid damage caused by the surrounding environment or 
foreign objects. Unauthorized persons must be kept away from the tanks. 

Содержание RainHarvest Systems Top-Tank 323002

Страница 1: ...g Any missing instructions must be requested directly from us A complete check of all the items components for possible damage must be carried out before the assembly or installation begins The installation must be carried out by a professional firm Table of Contents 1 GENERAL NOTES 2 1 1 Safety 2 1 2 Identification obligation 2 2 INSTALLATION SET UP REQUIREMENTS 2 2 1 Assembly above ground 2 3 TR...

Страница 2: ...an accidental connection to the drinking water network even after years Even when there are correct labels irritations are possible e g through children That is why all tapping points of process water have to be installed with child proof valves 2 Installation set up requirements 2 1 Assembly above ground The tanks must be installed on an appropriate level and compacted surface that is free from s...

Страница 3: ...f the inner seat recess Before the second half of the tank is set in position the seal and the seat recess of the upper half must also be well coated with the lubricating soft soap During the assembly it is important to ensure that the seal does not slip out of the seat recess To secure the two halves the connection clips are fitted first in a counter clockwise direction and then in a clockwise di...

Страница 4: ... into the tank at least 20 cm If more than two tanks are to be connected to one another then in addition to the lower connection inlet there must also be an upper connection to ensure ventilation 6 2 Laying connections The connection of the inlet and overflow is by means of the pre drilled openings of the tank or by means of the pre molded connection points intended for opening All the suction and...

Отзывы: