
Gra
Illustra
u
p
6.3 Ai
S
a
a
af plastic ext
El
ation only: M
Elect
Make sure c
upright befor
Use only ma
prevent the c
ir hose conn
Pull the air h
Seal the con
and causing
also the othe
terior cabin
lectric cable:
ust comply w
trical standar
Filling up:
cabinet stand
re filling up th
aterial that is
cabinet from
nection
hoses throug
nduit pipe to
corrosion. U
er end (tank
6
.
Assem
et for EPro1
with all Austr
rds
s levelled an
he pit
free from roc
damage
h the condui
prevent any
Use one GRA
side) of cond
mbly of sw
15 / 25
15
ralian
nd
ck to
it pipe (100m
y gases from
AF sealing ca
duit pipe.
witch cabin
Plastic ca
Can g
Make
upright
Filling
filling
granula
soil wh
in long
to be re
mm DWV PVC
m transfering
ap at the cab
net
abinet for EP
Electric c
go directly in
through ope
Filling
sure cabine
t before filling
up the insid
granulate (
ate reduces
hich can lead
run. The gr
eplaced.
C). Make sur
from treatm
binet side an
Pro18 Comm
cable:
nto the cabine
en bottom
up:
et stands le
g up the pit
de of bottom
(GRAF 107
humidity co
d to corriosi
ranulate doe
re hoses are
ent tank into
nt the second
mercial
et
evelled and
m part with
7607). The
oming from
on damage
es not need
e not kinked.
o the cabinet
d one to seal
t
l