Preparation
3A7026A
5
Preparation
Pressure Relief Procedure
Follow the Pressure Relief
Procedure whenever you see this
symbol.
1.
Turn ON/OFF switch to the
OFF
position. Wait 7 seconds for power to
dissipate.
2.
Trigger gun into material hopper.
3.
Open air control valve.
4.
Open gun prime valve.
This equipment stays pressurized until
pressure is manually relieved. To help
prevent serious injury from pressurized
fluid or splashed fluid follow the
Pressure
Relief Procedure
whenever sprayer is
stopped and before sprayer is cleaned or
checked, and before equipment is
serviced.
ti27340a
ti27339a
ti27341a