Installation
309908G
11
Component A Dispense
Solenoid A opens dispense valve A. The correct dose of
component A flows into the integrator (Z). Solenoid A
closes dispense valve A. See F
. 4.
Component B Dispense
Solenoid B opens dispense valve B. The correct dose of
component B flows into the integrator (Z) and is aligned
proportionately with component A. Solenoid B closes
dispense valve B. The components are pre-mixed in the
integrator, then uniformly blended in the static mixer
tube (ST). See F
F
IG
. 4. Component A Dispense
Z
F
IG
. 5. Component B Dispense
ST
F
IG
. 6. Fluid Mix Manifold
TI4699a
F
B
OFF
F
B
ON
F
B
F
A
F
A
ON
F
A
OFF
H
A
J
A
G
A
H
B
G
B
J
B
Z
ST
Содержание ProMix Easy Series
Страница 38: ...Technical Data 38 309908G ...