Installation
8
332511B
4. Connect the Power Leads.
Label “A” and “B” leads for identification in step 10. Route all the wires through the conduit when connections are
complete.
5. Mount the RTD.
Route the wire through the conduit when connections are complete.
- (2) “B” Leads
- (3) “A” Leads
- (1) RTD
- (1) Washer
- (1) M5 Screw