Kits and Accessories
3A6586D
29
Communication Gateway Module (CGM) Kits
CGM Kits
Installing a CGM Kit
1.
Follow the
Pressure Relief Procedure
on page
2.
Verify the power is off to the system.
3.
Mount the CGM near the pump or near the integra-
tion point.
4.
Drill the mounting holes using the mounting hole
dimensions shown in
Figure 21
.
5.
Remove the access cover from the CGM (U).
Loosen the two screws (T) and remove the CGM (R)
from the base (S) as shown in
Figure 22
.
6.
Using the four 10-32 mounting screws included with
the kit, mount the base (S) in the holes you drilled.
7.
Reattach the CGM (R) on the base (S) with the two
screws (T) that were removed in step 5.
8.
Reattach the access cover (U).
F
IG
. 20: CGM CAN Connections
Part Number Description
25E426
CGM Kit, Ethernetip
25E427
CGM Kit, DeviceNet
25E428
CGM Kit, PROFINET
25E429
CGM Kit, PROFIBUS
All electrical wiring must be done by a qualified elec-
trician and comply with all local codes and regulations
CAN Port 1
CAN Port 2
F
IG
. 21: CGM Mounting Holes
F
IG
. 22: Disassembling the CGM
3
.25 in.
(
8
2.6 mm)
2.75 in.
(6
9
.
9
mm)
#10-
3
2 UNF
(M5 x 0.
8
)
R
T
S
U
Содержание E-Flo SP
Страница 45: ...California Proposition 65 3A6586D 45...