Operation
332540B
7
1.
Mount Reservoir on sturdy, flat surface. Note loca-
tion of Fill Port (G) and Lubricant Outlet Connection
(A) for easy access once installed.
2.
Connect High Pressure Lubricant Supply Line (D) to
the Lubricant Outlet Connection (A).
3.
Ground system (see
Grounding
). Mount reservoir
to grounded chassis member.
Pump Installation
Pump installation instructions are provided in the
Dyna-Star HP or HF Pump instruction manual 332514
provided with your system.
Vent Valve Kit
The vent valve is used to reduce system pressure and
allow the injector to reset. When energized, grease is
pumped out through the outlet port (marked 0) on the
vent valve. When de-energized, it vents pressure inter-
nally to tank.
Refer to the Dyna-Star HP or HF Vent Valve Kit manual
332515 for installation and operation instructions.
Operation
•
Read and follow instructions supplied with each sys-
tem component.
•
Reference letters used in the following Installation
instructions, refer to Typical Installation Key, page 5.
Start-up
Priming
1.
After reservoir/tank is completely filled, remove high
pressure lubricant supply line (D) from the outlet.
2.
Connect power to pump.
3.
Start pump and run pump until all air has been
expelled and fluid flow is continuous.
4.
Reconnect the high pressure lubricant supply line
(D) to outlet.
Do not insert finger into the overflow port while
filling a reservoir equipped with a follow plate. Injury
or amputation could result.
Содержание Dyna-Star 77X100
Страница 13: ...Notes 332540B 13 Notes...