Installation
313516F
11
Install Air Fittings
1. Install the supplied 1/4 in. tube fitting into
the cylinder (CYL) air port.
2. Install 3/8 in. tube fittings into the atomiza-
tion (ATOM) air port and the fan (FAN) air
port.
Ground System
The following grounding instructions are mini-
mum requirements for a system. Your system
may include other equipment or objects that
must be grounded. Check your local electrical
code for detailed grounding instructions for
your area and type of equipment. Your system
must be connected to a true earth ground.
Ground Pump/Fluid Supply
Ground the pump by connecting a ground wire
and clamp between the fluid supply and a true
earth ground as instructed in your separate
pump instruction manual.
Ground Air Compressors and
Hydraulic Power Supplies
Ground the air compressors and hydraulic
power supplies according to the manufacturer
recommendations.
Ground Spray Gun
Ground the spray gun by mounting the mani-
fold to a properly grounded reciprocator, robot,
or stationary mount. Check the electrical resis-
tance between the manifold and a true earth
ground. The resistance must be less than 1
megohm.
Ground Fluid Supply Container
Ground the fluid supply container according to
local code.
Ground Object Being Sprayed
Ground the object that is being sprayed
according to local code.
Ground Solvent Pails
Ground all solvent pails that are used when
flushing according to local code. Use only
metal pails, which are conductive. Do not place
the pail on a non-conductive surface, such as
paper or cardboard, which interrupts the
grounding continuity.
F
IG
. 2: Air Fittings
CYL
ATOM
FAN
ti8211a