Operation
3A8503C
15
Operation
Flush Before Using Equipment
The equipment was tested with lightweight oil, which is
left in the fluid passages to protect parts. To avoid
contaminating your fluid with oil, flush the equipment
with a compatible solvent before using the equipment.
Flush the equipment. See your Reactor 3 operation
manual.
Pressure Relief Procedure
1. Follow the
Pressure Relief Procedure
in your
Reactor 3 operation manual to relieve system
pressure.
2. Turn the TPC power switch (PS) to OFF.
3. Open the fluid drain valve (AE).
NOTICE
Do not operate if the pump lower and electric
motor are not properly coupled together or without
the clamp installed and tightened. Damage to the
equipment could occur.
To avoid fire and explosion, always ground
equipment and waste container. To avoid static
sparking and injury from splashing, always flush at
the lowest possible pressure.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury from
pressurized fluid, such as skin injection, splashing
fluid and moving parts, follow the Pressure Relief
Procedure when you stop spraying and before
cleaning, checking, or servicing the equipment.
WLD
AE
PS
Содержание 26D000
Страница 34: ...Dimensions 34 3A8503C...