GC-1412D
7
6\VWHP$VVHPEO\
$Q\PRXQWLQJRSWLRQFDUWPDVW ERRPÀRRUPRXQW
or wall mount etc. should be completely assembled
before starting the following steps.
Tools Required:
6WDQGDUGZUHQFK VRFNHWVHW
6WDQGDUGKH[NH\VHW
3) Tape measure
All “Required tools” are standard sizes.
1.
Loosen clamp bolts to expose pump mounting
EUDFNHW$WWDFKSXPSPRXQWLQJEUDFNHWWRWKHDLU
PRWRU8VHWKUHDGORFNHURQWKHWKUHDGVDQGWLJKWHQ
KH[EROWVDVWLJKWDVSRVVLEOHLQKH[NH\
2.
a.
Stand the pump assembly next to the mast and
LQVWDOOWKHSXPSPRXQWLQJEUDFNHW
E
Lift to desired height with the pump assembly facing
the front of the cart as shown, approximately 41in.
from the top of the cart to the top of the pump mount-
LQJEUDFNHW8VHLQZUHQFKDQGWLJKWHQDVWLJKWDV
possible.
19890-00
HEX BOLTS
41in./104 cm.
APPROX.
Set-Up
Содержание 20864-05
Страница 31: ...GC 1412D 31 Notes ...