26
Cutie Frame
Pass the take-up rail through the throat of the machine. Make sure the long half of the take-
up rail is on the right side.
5
Installing the Rails (Continued)
Short Take-up
Rail
Long Take-up
Rail
Place the rail into the grooves on each of the frame sides. The two rectangular notches in the
rails must point down.
6
Close the rail caps to secure the take-up rail.
7
Содержание Cutie
Страница 1: ...Assembly Use Grace Company July 13 2021 V1 3 ...
Страница 2: ...Cutie Frame ...
Страница 15: ...15 Cutie Frame Step 4 Completed Aligning the Tracks Continued ...
Страница 30: ...30 Cutie Frame Step 9 Completed Installing the Rails Continued ...
Страница 50: ...50 Cutie Frame ...
Страница 51: ...51 Cutie Frame ...
Страница 52: ...52 Cutie Frame Cutie Frame The Grace Company Phone 1 800 264 0644 www graceframe com ...