24
Cutie Frame
Step 8 - Installing the Rails
Parts & Tools Needed:
Short Front Rail
Long Take-up Rail
Short Take-up Rail
Long Front Rail
Instructions
The rails hold your quilt in place while you work. Please take the following steps to assemble and
install the frame rails:
Locate the long and short take-up rails. The take-up rail pieces have two rectangular cut-
outs on one end.
1
Rail Corner Top (x2)
Rail Corner Bottom (x2)
Allen Wrench
2.5 mm
14
17
Allen Wrench
2 mm
Hoop Side Rail (X2)
14
17
Long Take-up
Rail
Short Take-up
Rail
SBHCS
M4 X 25 mm (x6)
Содержание Cutie
Страница 1: ...Assembly Use Grace Company July 13 2021 V1 3 ...
Страница 2: ...Cutie Frame ...
Страница 15: ...15 Cutie Frame Step 4 Completed Aligning the Tracks Continued ...
Страница 30: ...30 Cutie Frame Step 9 Completed Installing the Rails Continued ...
Страница 50: ...50 Cutie Frame ...
Страница 51: ...51 Cutie Frame ...
Страница 52: ...52 Cutie Frame Cutie Frame The Grace Company Phone 1 800 264 0644 www graceframe com ...