background image

Remove Top Cover

Lift top cover straight up to remove as shown.

Step 2.

·

PS-2

24V DC

OUTPUT

L

INP
UT 120-277 VAC

G

N

RLY1

RLY2

[ -]

[+]

RLY1

RLY2

RELAY

Wiring

NOTE:

 Metallic conduit shall be properly bonded in accor

dance with the national electric code article 250.

Connect the appropriate conduit and fitting as necessary for 

the application.

Route the wires as shown and make connections according to the marking located on the product. 

Tighten the fittings to adequately secure the cable and conduit.

Step 3.

·

·
·

For installations in plenum spaces use only metallic clad conduit on incoming AC power.

Wire colors will vary by incoming AC power and GPS product.

Содержание PS-2

Страница 1: ...www globalplasmasolutions com Installation Operation Maintenance Manual NOTICE This product is to be used only as directed Read entire manual before use Do not use unless properly installed ...

Страница 2: ... 70 specifically for the installation of wiring and clearances from power and lighting conductors 4 Installation work and electrical wiring must be done by qualified person s in accordance with all applicable codes and standards including fire rated construction 5 WARNING Risk of Fire Installation involves special wiring methods to run wiring through a building structure Consult a qualified electricia...

Страница 3: ...e to not damage wiring when installing away from ionizer NOTE Use temperature Maximum ambient temperature in which unit shall be used 160 F 70 C Before you start confirm the contents of your shipment Each PS 2 will consist of the following 1 PS 2 Power Supply 1 2 Cable Gland 1 3 Self drilling sheet metal screws 4 Supplies Not Included 1 Conduit fitting for incoming AC power 2 Wiring for incoming AC ...

Страница 4: ...ure power is disconnected to the HVAC equipment before installation Remove Screws Remove two screws from the top cover as shown Step 1 Review the installation video at our website or scan the QR code opposite CAUTION High Voltage ...

Страница 5: ...ational electric code article 250 Connect the appropriate conduit and fitting as necessary for the application Route the wires as shown and make connections according to the marking located on the product Tighten the fittings to adequately secure the cable and conduit Step 3 For installations in plenum spaces use only metallic clad conduit on incoming AC power Wire colors will vary by incoming AC po...

Страница 6: ...Mounting Using the supplied fasteners mount the PS 2 to an appropriate vertical or horizontal surface Step 4 ...

Страница 7: ...For the latest applicable version of this manual visit our website or utilize the QR code Product Registration By registering your order the standard limited warranty on eligible products from your purchase is automatically extended to 3 years at no additional cost Register your products at www gpsair com product registration or scan the QR code ...

Страница 8: ...te 400 Charlotte NC 28208 980 279 5622 www gpsair com 2022 GPS Air GPS Air is the owner of certain trademarks that appear in our materials Please visit www gpsair com trademarks for a list of our marks GPS 041 31 R21 PS2 IOM ...

Отзывы: