
Start-up
20
Start-up
Before start-up, make sure that:
•
The device or the installation has no damages or malfunctions.
•
All connections (electrical, mechanical, pneumatic) have been made properly.
•
The device or the installation is placed and situated correctly.
•
All protective covers (if applicable) have been fitted correctly.
•
That all objects larger than 10mm are blocked from entering the product channel.
•
The device is thoroughly cleaned, internally and externally.
•
The product does not fall into the magnet device, from a greater height than 10 meters.
•
There are no other sources of danger present.
During start-up, make sure that:
•
The device or the installation has no damages or malfunctions.
•
All other parts of the device or installation function as described.