Add liquid to the pump casing when:
1. The pump is being put into service for the
first time.
2. The pump has not been used for a consider
able length of time.
3. The liquid in the pump casing has evapo
rated.
Once the pump casing has been filled, the pump
will prime and reprime as necessary.
After filling the pump casing, reinstall
and tighten the fill plug. Do not attempt
to operate the pump unless all connect
ing piping is securely installed. Other
wise, liquid in the pump forced out un
der pressure could cause injury to per
sonnel.
To fill the pump, remove the pump casing fill cover
or fill plug in the top of the casing, and add clean
liquid until the casing is filled. Replace the fill cover
or fill plug before operating the pump.
NOTE
If the suction or discharge piping is open, a hose
can be used to fill the casing through the piping.
ROUTINE OPERATION
Adjust the engine speed to achieve the desired
output. Do not exceed the factory set engine speed
and system operating pressure. Do not operate
below the recommended operating speed (if appli
cable).
Never tamper with the governor to gain
more power. The governor establishes
safe operating limits that should not be
exceeded. Refer to the Performance
Curve in Section E for the maximum
continuous operating speed for this
pump.
A Gorman‐Rupp automatic air release valve may
be installed in a bypass line, or the bypass line may
be left open.
A manual shut‐off valve should not be
installed in any bypass line. A manual
shut‐off valve may inadvertently be left
closed during operation. A pump which
has lost prime may continue to operate
without reaching prime, causing dan
gerous overheating and possible explo
sive rupture of the pump casing. Per
sonnel could be severely injured.
Lines With a Bypass
If a Gorman‐Rupp Automatic Air Release Valve has
been installed, the valve will automatically open to
allow the pump to prime, and automatically close
after priming is complete (see
INSTALLATION
for
Air Release Valve operation).
If the bypass line is open, air from the suction line
will be discharged through the bypass line back to
the wet well during the priming cycle. Liquid will
then continue to circulate through the bypass line
while the pump is in operation.
Lines Without a Bypass
Open all valves in the discharge line and start the
engine. Priming is indicated by a positive reading
on the discharge pressure gauge or by a quieter
operation. The pump may not prime immediately
because the suction line must first fill with liquid. If
the pump fails to prime within five minutes, stop it
and check the suction line for leaks.
After the pump has been primed, partially close the
discharge line throttling valve in order to fill the line
slowly and guard against excessive shock pres
sure which could damage pipe ends, gaskets,
sprinkler heads, and any other fixtures connected
to the line. When the discharge line is completely
filled, adjust the throttling valve to the required flow
rate.