THESE TWO HOLE LOCATIONS
WILL BE EMPTY ON YOUR SWING
BEAM. LINE THEM UP WITH THE
HOLES IN THE SWING LEG
BRACKET UNDER THE SWING BEAM.
STEP 23: REST SWING BEAM ON FORT
*TWO PEOPLE ARE REQUIRED FOR THIS STEP
1: LAY THE SWING BEAM ACROSS THE TOP OF THE FORT RAILINGS.THE END OF THE SWING BEAM WITH TWO EMPTY
HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM.
62
Содержание 01-0033-AP-1
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 9: ......
Страница 17: ...SANDBOX SEAT STEP 2 REMOVING SANDBOX SEATS 1 REMOVE THE TWO SANDBOX SEAT BOARDS TO ATTACH THE WALL BOARDS ...
Страница 66: ...IRON DUCTILE SWING HANGERS 11 4012 TELESCOPE 07 0001 10 ROCK WALL ROPE 6 PICTURE DESCRIPTION QTY 1 1 31 ...
Страница 67: ...PICTURE DESCRIPTION QTY 90 GREEN BRACKET 11 5013 SPRING CLIP 11 4003 4 6 SAFETY HANDLES PAIR 07 0005 1pr 32 ...
Страница 70: ...EXTREME TUBE SLIDE 03 0014 1 PICTURE DESCRIPTION QTY 35 ...
Страница 137: ...APPENDIX 102 ...