Gordic Environment AB PELLX Скачать руководство пользователя страница 21

Eng. Edition 1.0  2004, Nov. 

20 

First start/adjustment during operation 

 
 
 
 
 
 

 

The burner is not factory adjusted. It has to be adjusted at the first start. We 
suggest that a preliminary adjustment is carried out at the first start, which make 
the burner function satisfactory. After operation in normal mode for one or two 
weeks, the final adjustment can be carried out.  

 

When carrying out a preliminary adjustment and control of the function, the 
combustion quality can be evaluated by visual inspection of the flame size and 
colour. A few minutes after start, the flame should be yellow/white. A dark 
yellow flame means that the burner gets too much fuel or an insufficient volume 
of air. A white flame means too much air or an insufficient amount of fuel. It is 
quite normal if the colour of the flame varies a bit between white and yellow. 
Grey or black smoke from the chimney is also an indication of insufficient air. 
White smoke mainly consists of water vapour and is normal at low outside 
temperatures. If the boiler was earlier wood fired, the smoke may be dark and 
has a strong smell caused by tar that is burnt away from the walls in the boiler 
and the chimney. This may go on for about a week.  
 

Adjustment of air volume and fuel quantity

 

 

1. Fill the feed screw with pellets before connecting it to the burner. See 
description in the Operation and Maintenance Manual.  

 

2. Set the start portion (quantity of pellets at ignition) with the knob on the 
control box. Turn clockwise to increase the quantity. Approx. 2-3 dl (150-200 g) 
is a normal portion. Always check the start portion when changing setting or 
fuel type. Too large start portion may temporarily cause grey/black, bad 
smelling smoke 5-10 minutes after start. If the start portion is too small, it will 
not be possible to ignite the burner at all, or two or three attempts are needed.  
The start portion may also burn out before the burner reaches the operational 
mode.  
 
 
 
 
 
 

If the ignition fails, do not open the fire place door until the 
combustion chamber is totally ventilated! Wait at least 10 minutes 
after the 3rd starting attempt and be careful .

 

Be very careful when opening the fire place door or inspection eye 
during operation. Keep your face at a safe distance and be 
prepared to close the door quickly.

 

Содержание PELLX

Страница 1: ...Gordic Environment AB P O Box 11 SE 280 22 Vittsj Sweden Installation Manual PellX 20 kW Pellets Burner...

Страница 2: ...l 8 Burner installation 9 Pellet storage 9 Feed screw installation 10 Installation of the control box 11 Connection of temperature sensor 13 Draft regulator 14 2 3 ELECTRICAL INSTALLATION 15 Mains sup...

Страница 3: ...ar questions please contact the authorized PellX dealer for more detailed information This burner is different from earlier versions The electronic control system is completely new and the design is i...

Страница 4: ...tion __________ 400 W Power consumption operation _________ 40 W Fuel ___________________________ Wood pellets 6 or 8 mm max length 30 mm Dimensions outside the boiler Depth __________________________...

Страница 5: ...lame trap pipe Hose clamps 2 pcs for the plastic tubing Suspendor straps for the feed screw Signal cable 3 m 15 poles D Sub cable Mains cable 2 5 m for mains supply to the burner Net cable 2 5 m for c...

Страница 6: ...e pellets burner is to be installed the chimney and other auxiliary equipment must comply with the current fire protection regulations and local standards The boiler room must be provided with an open...

Страница 7: ...e reduced to 200 mm The important thing is that the flames from the combustion chamber tube never reach the boiler wall The minimum distance to the bottom of the fireplace depends on the boiler design...

Страница 8: ...high temperature can damage the chimney and is also uneconomical Condensation in the chimney must be attended to First check and adjust the temperature The exhaust gas temperature shall be at least 8...

Страница 9: ...odifications needed etc If the standard flange can not be used a flat mounting plate is available as option Adjust and fasten the plate to the boiler seal with insulation cement Fasten the burner body...

Страница 10: ...screw can be broken Insulate the flange and the mantle with mineral wool An extra covering plate with holes for the flange stop screw is a practical complement which also functions as a distance so th...

Страница 11: ...the screw without deforming the pipe Most storage hoppers on the market intermediate types week size types etc are provided with a connection sleeve that fastens the tube perfectly Balance the tube b...

Страница 12: ...the boiler The screws are not supplied Dismantle the front panel which is held by two screws You have now access to the electronics and the terminal Connections to control box terminal 1 2 Alarm rela...

Страница 13: ...connection 15 poles D sub with straight coupling 2 Mains supply 230V with fuse S L phase PE earth and N zero 3 Feed screw mains socket 230 V The burner is as standard delivered with 3 m signal cable...

Страница 14: ...stops If the temperature sensor is placed on the accumulator tank there must be a loading circuit with capacity to cool down the boiler so that the boiler temperature does not exceed 95 C before the...

Страница 15: ...increase by 40 50 at low outside temperatures sometimes more if very windy The pellets burner requires a constant depression in the chimney not exceeding 15 20 Pa for optimal operation The relation be...

Страница 16: ...idered to be satisfactory the electrician has to make sure that it is correctly connected i e it switches off the phase wire L The overheat protection sensor shall be placed in an insert or in the bes...

Страница 17: ...e service Pull slightly backwards to remove them from the triac unit The cables shall be fixed in pairs with straps Internal connections 1 2 Flame sensor 3 4 Overheat protection flame trap pipe 5 6 As...

Страница 18: ...Start Effect H igh and Effect L ow Indicator light Larm Alarm Test red Indicator light On green Test button Funkt Function witch 0 9 Pann Temp Boiler temp setting switch off temp Operating switch on o...

Страница 19: ...f illuminated diodes will follow the setting Put the operating switch in position off when the adjustment is finished Adjustment of fuel quantity at start Put the switch in position 9 the operating sw...

Страница 20: ...ff when the adjustment is finished Adjustment of boiler temperature shut off temperature Put the switch in position 5 the operating switch in position on and press the test button The number of diodes...

Страница 21: ...od fired the smoke may be dark and has a strong smell caused by tar that is burnt away from the walls in the boiler and the chimney This may go on for about a week Adjustment of air volume and fuel qu...

Страница 22: ...sted start portion set the air volume at maximum for both high and low effects before the first start The fine adjustment of the burner is to be carried out when the boiler has reached the normal oper...

Страница 23: ...imney Exception Chimneys with an insert tube can be considered more corrosion resistant Ask your PellX dealer for advice Open the control box and remove the front panel For disconnection of the low ef...

Отзывы: