Goodwe SECU-A Series Скачать руководство пользователя страница 8

Warning of Electric Shock

It is danger to get electric shock when live components or DC cables are touched.

Disconnect the battery from voltage source before working on the device. Make sure of no any 
manual operation under load. And do not touch non-insulated parts or cables. And wear suitable 
protective equipment for all work on the system.

Warning: If battery is wetted, make sure it is not touched by hand, and contact technical 
support

Surge Protection

Over voltages can be further conducted into the building or other connected devices in the same 
network via network cables or other cables if there is no surge protection.

Ensure that the system is integrated into the existing surge protection.

9. Disclamer

→ All the information in this document is the property of GoodWe No part of this document could be 

reproduced in any way for business use. Internal use is allowed.

→  GoodWe  makes  no  representations  or  warranties  express  or  implied,  with  respect  to  this 

document or any of the equipment and/or software it may describe, including (with no limitation) any 
implied warranties of utility, merchantability, or fitness for any particular purpose. All such represen-
tations or warranties are expressly disclaimed. Neither GoodWe nor its distributors or dealers shall 
be liable for any indirect, incidental, or consequential damages under any circumstances.

→ The exclusion of implied warranties may not apply in all cases under some statutes, and thus the 

above exclusion may not apply. 

→ Specifications are subject to change without notice. Every effort has been made to make this 

document complete, accurate and up-to-date. However, GoodWe may need to make some 
improvements under certain circumstances without advance notice. GoodWe shall not be responsi-
ble for any loss caused by this document including, but not limited omissions errors, typographical 
errors, arithmetical errors or listing errors in this document.

11

Содержание SECU-A Series

Страница 1: ...PP LinkedIn Offical Website JIANGSU GOODWE POWER SUPPLY TECHNOLOGY CO LTD No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com SECU A Series User Manual Low Voltage Lithiu...

Страница 2: ...Connection 03 4 2 Communication Cable Connection 05 5 Battery Commissioning 06 5 1 Calibrating the DIP switch 06 5 2 Powering on the battery system 06 5 3 Setting the parameters of SECU A5 4L On PV Ma...

Страница 3: ...es work and are operated Knowledge of how an inverter works and is operated Knowledge of and adherence to the locally applicable connection requirements standards and directives the local standard for...

Страница 4: ...s on each inverter We just take SBP and ESA series inverter as example to introduce the connection in this manual 3 Product Overview 4 Cable Connection 4 1 Power Cable Connection LED Indicator Handle...

Страница 5: ...h DIP 2 3 Description To recognize the last battery connected to inverter To relize the communication between inverter and inverter unit part ON OFF Communication cable connection of SECU A5 4L with E...

Страница 6: ...S so that inverter will detect battery open circuit voltage to charge battery Select SECU A5 4L on battery page in PV Master Application Notes 1 Select wrong battery will lead to BMS communication fai...

Страница 7: ...diately Eye contact Rinse your eyes with clean water for at least 15 minutes and seek for medical help immediately Skin contact Wash the affected area thoroughly with soap and clean water and seek for...

Страница 8: ...ernal use is allowed GoodWe makes no representations or warranties express or implied with respect to this document or any of the equipment and or software it may describe including with no limitation...

Отзывы: