Goodwe LX F12.8-30 Скачать руководство пользователя страница 30

07  Equipment Commissioning

User Manual V1.0-2022-11-01

26

7.4  Indicator Status

Button Indicator

Status

Green

Standby or Working

Red

Alarming or Faulty

SOC 

Indicator

Button 

Indicator

Button Indicator

SOC Indicator

Description

Idle: green light blink 

2 times

Standby: green light 

blink 1 time

Working: steady green

SOC<5%

5%

SOC<25%

25%

SOC<50%

50%

SOC<75%

75%

SOC<95%

SOC

95%

7.4.1  Normal Status

NOTICE

•  The SOC indicator keeps on when charging.

•  The SOC indicator blinks one time when discharging.

Содержание LX F12.8-30

Страница 1: ...V1 0 2022 11 01 User Manual Rechargeable Li ion Battery System Lynx Home FH Series US...

Страница 2: ...ll descriptions here are for guidance only and other GOODWE trademarks are trademarks of GoodWe Technologies Co Ltd All other trademarks or registered trademarks mentioned in this manual are owned by...

Страница 3: ...eck Before Receiving 09 4 2 Deliverables 09 4 3 Storage 10 5 System Installation 11 5 1 Installation Requirements 11 5 2 Installing the Battery System 12 6 Electrical Connection 16 6 1 Safety Precauti...

Страница 4: ...ual V1 0 2022 11 01 III 7 4 Indicator Status 26 7 4 1 Normal Status 26 7 4 2 Alarming Status 27 7 4 3 Faulty Status 27 08 Maintenance 29 8 1 Power OFF the Battery System 29 8 2 Routine Maintenance 29...

Страница 5: ...installation electrical connection commissioning troubleshooting and maintenance Read through this manual before installing and operating the product All the installers and users have to be familiar w...

Страница 6: ...All operations during the transportation have to be recorded The equipment shall be kept in balance thus avoiding falling down 2 1 General Safety 2 2 Battery Safety NOTICE The information in this use...

Страница 7: ...is power off before any operations Keep the equipment away from children Operate the equipment properly to avoid explosion danger It is forbidden to dismantle the equipment personally The equipment c...

Страница 8: ...breathing apparatus If the battery module leaks electrolyte avoid contact with the leaking liquid or gas The electrolyte is corrosive It will cause skin irritation or chemical burn to the operator Any...

Страница 9: ...s capacity expansion A maximum of 6 battery modules can be used to extend the usable energy of the battery system 3 1 Product Overview Intended usage Usable energy description 9 60kWh Battery system 1...

Страница 10: ...ow or visit the official website to get the Approved Inverter List matched with the Battery System Approved inverter list GoodWe Inverter GE Inverter Battery system 1 Battery system N PV string Batter...

Страница 11: ...y 8 Base NOTICE Ensure that the PCU is installed above the battery modules Do not install any battery modules above the PCU This manual will show you the installation and electrical connection of 6 ba...

Страница 12: ...anual V1 0 2022 11 01 08 Right View Left View Front View Power control unit appearance No Parts 1 Ventilation valve 2 Cable hole 3 Air switch 4 SOC indicator 5 Button indicator 6 Battery serial connec...

Страница 13: ...iving Check the following items before receiving the product 1 Check the outer packing box for damage such as holes cracks deformation and other signs of equipment damage Do not unpack the package and...

Страница 14: ...the equipment complying with the labels and requirements on the packing box 4 The equipment must be stacked with caution to prevent them from falling 5 Keep the equipment away from flammable explosive...

Страница 15: ...wall when drilling holes 4 Install the equipment in a sheltered place to avoid direct sunlight rain and snow Build a sunshade if it is needed 5 Install the equipment in a well ventilated place to ensu...

Страница 16: ...and fireproof Install the equipment on a surface that is solid enough to bear the product weight Put the battery system near the wall and install the locking brackets to prevent the battery from fall...

Страница 17: ...Install the locking bracket of the PCU Step 9 Put the PCU above the installed battery module securely Mark the drilling hole with a marker then remove the PCU Step 10 Drill holes with the hammer dril...

Страница 18: ...05 System Installation User Manual V1 0 2022 11 01 14...

Страница 19: ...User Manual V1 0 2022 11 01 05 System Installation 15...

Страница 20: ...ety precautions outlined in this manual and safety labels on the equipment during the operation All operations cables and parts specification during the electrical connection shall be in compliance wi...

Страница 21: ...e parallel connected in one energy storage system Ensure that the usable energy of each battery system is the same Install the terminal resistor to the COM3 port of Battery system 1 which is connected...

Страница 22: ...conduit and the equipment interface is sealed Otherwise the protection level of the equipment may be affected which may cause damage to the equipment No PIN Definition Silk Print Recommended Cable Dim...

Страница 23: ...heat shrink tube Step 4 Connect the PE cable 6 2 2 Connecting the Communication Cable NOTICE Connect the PE cable first before installing the equipment Disconnect the PE cable before dismantling the e...

Страница 24: ...the DC cables with the delivered terminals The manufacturer shall not be liable for the damage if other terminals are used Power off the battery system before connecting the power cable to avoid high...

Страница 25: ...CAN3H COM1 connects to the BMS communication port on the inverter for communication with the inverter or connects to the parallelized battery system for communication COM2 COM3 BMS communication for...

Страница 26: ...ICE If the terminal resistor is not installed the Interlock Failure will occur and the system cannot work correctly Step 1 Disassemble the waterproof module Step 2 Install the terminal resistor Tighte...

Страница 27: ...are connected correctly and securely 3 Cable ties are intact routed properly and evenly 4 Unused ports and terminals are sealed Check the following items before power on to avoid the battery system b...

Страница 28: ...Battery system N 2 N 8 Parallel Connected Battery System Step 1 Optional Turn on the breaker between the inverter and the battery system Step 2 Turn on the breakers between the battery systems Step 3...

Страница 29: ...install the PV Master App Connect your smart phone and the inverter Wi Fi SSID Solar WiFi Password 12345678 Select LX F H US on Select Battery Model window via the PV Master App Set battery model via...

Страница 30: ...or Faulty SOC Indicator Button Indicator Button Indicator SOC Indicator Description Idle green light blink 2 times Standby green light blink 1 time Working steady green SOC 5 5 SOC 25 25 SOC 50 50 SO...

Страница 31: ...Temperature Power off and wait for 2 hours Contact the After Sale Service if the problem could not be solved Interlock Failure Contact the After Sale Service if the problem could not be solved Others...

Страница 32: ...Sale Service if the problem could not be solved Insulation Fault Do not touch the battery Contact the After Sale Service Internal Communication Fault Power off and check the communication cables Resta...

Страница 33: ...Do not touch or disassemble privately because the high voltage danger exists In case of other emergencies contact the after sales service as soon as possible Operate following the instructions or wait...

Страница 34: ...122 Discharge 5 122 Relative Humidity 95 Altitude Ft 9842 Communication CAN Weight lb 300 9 384 7 468 5 552 3 Dimensions W H D in 23 6 15 29 5 23 6 15 35 6 23 6 15 41 7 23 6 15 47 8 Ingress Protection...

Страница 35: ...Official Website Contact Information PV Master App GoodWe Technologies Co Ltd No 90 Zijin Rd New District Suzhou 215011 China www goodwe com service goodwe com...

Отзывы: