14
In case that more
than 5m.
SERVICE
Torque Wrench Requirements for installation
Cable Connection
Pipe Length & Elevation Requirements
CAUTION:
Capacity is based on standard length and maximum allowance length is based on reliability. Oil trap should
be installed every 16.4 feet - 22.07 feet (5 - 7 meters.)
(16 Feet)
The power cord or cable connection
should be selected according to this
specification table.
Torque
Torque
mm
Inch
Lbs. per ft.
Kg.m
ϕ
6.35
1/4
13
1.8
ϕ
9.52
3/8
30
4.2
ϕ
12.70
1/2
40
5.5
ϕ
15.88
5/8
48
6.6
ϕ
19.05
3/4
48
6.6
Outside Diameter
12
18
24
mm
2
1.0
1.5
2.5
AWG
14
14
12
Unit Size
Line Set Length
Max.
Additional Refrigerant
Provided
Length
Per foot
Vapor
Liquid
with Unit
Elevation
Overall
of Additional Line
BTUH/h
Inches (m)
Inches (m)
Feet (m)
B Feet (m)
A Feet (m)
Oz. (g/m)
12k
1/2" (
ϕ
12.7)
1/4"
(ϕ
6.35)
16 (5)
16 (5)
32 (10)
0.3 oz. (30)
5/8" (
ϕ
12.7)
1/4"
(ϕ
6.35)
16 (5)
32 (10)
65 (20)
0.3 oz. (30)
5/8" (
ϕ
12.7)
3/8" (
ϕ
9.52)
16 (5)
32 (10)
65 (20)
0.6 oz. (30)
Capacity
Max
18k - 24k
Pipe Size