2
S
HIPPING
I
NSPECTION
All units are securely packed in shipping containers tested
according to ISTA specifications. The carton must be checked
upon arrival for external damage. If damage is found, a
request for inspection by carrier’s agent must be made in
writing immediately.
Inspect the kit carefully on arrival for damage and screws
or wires which may have come loose in transit. In the event
of damage the consignee should:
1. Make a notation on delivery receipt of any visible
damage to shipment or container.
2. Notify carrier promptly and request an inspection.
3. With concealed damage, carrier must be notified as soon
as possible - preferably within five days.
4. File the claim with the following support documents
within a nine month statute of limitations.
•
Original or certified copy of the Bill of Lading, or
indemnity bond.
•
Original paid freight bill or indemnity in lieu thereof.
•
Original or certified copy of the invoice, showing
trade and other discounts or reductions.
•
Copy of the inspection report issued by carrier’s
representative at the time damage is reported to
carrier.
The carrier is responsible for making prompt inspection of
damage and for a thorough investigation of each claim. The
distributor or manufacturer will not accept claims from
dealers for transportation damage.
S
TANDARD
A
IR
HANDLER
I
NSTALLATION
HKS
ELECTRIC
HEATER
KITS
MAY
ONLY
BE
INSTALLED
IN
ARUFXX14YY,
ARPTXX14YY, ASUFXX14YY, ASPTXX14YY, AVPTXX14YY,
DVXXPTC14YY
MODELS
(
WHERE
XX
IS
THE
TWO
-
DIGIT
SIZE
AND
YY
ARE
REVISION
LETTERS
).
WARNING
ONLY
INSTALL
HEATER
KITS
INTO
AN
AIR
HANDLER
THAT
ARE
LISTED
AS
APPROVED
ON
THE
RATING
PLATE
OF
THE
AIR
HANDLER
.
WARNING
T
O
PREVENT
PERSONAL
INJURY
OR
DEATH
WHEN
INSTALLING
IN
A
GARAGE
,
THE
ELEMENT
MUST
BE
AT
LEAST
18”
ABOVE
THE
FLOOR
.
WARNING
T
O
AVOID
PROPERTY
DAMAGE
OR
PERSONAL
INJURY
DUE
TO
FIRE
,
USE
ONLY
COPPER
CONDUCTORS
.
CAUTION
1. Remove the upper access panel from the air handler.
2. Remove and retain the four (4) screws securing the cover
plate. Remove and discard the cover plate.
3. For electric heat kits with circuit breakers, remove the
two screws securing the circuit breaker mounting plate
to the electric heat face plate.
NOTE:
The circuit breakers for the 25kW are placed
separately in the carton and are not attached to the
heater plate.
4. Slide the electric heat kit into the opening in the air
handler, making sure the direction of airflow decal
attached to the electric heat face plate is pointing in
the correct direction, and secure the electric heat face
plate using the screws removed in Step 2. Use caution
to not bend or damage the electric heating elements,
the limit switches or fuses during this process. See Figure
1.
Airflow
Direction
Figure 1
5. For downflow applications with electric heat kits that
have circuit breakers, the circuit breakers must be
rotated 180 degrees (such that the ON position will
be with the circuit breaker handles up). To do so,
remove and retain the 2 screws securing the circuit
breaker clamps, rotate the circuit breakers and
clamps 180 degrees, then use the same 2 screws to
re-secure the circuit breakers. See Figure 2.