background image

2

S

HIPPING

 I

NSPECTION

All units are securely packed in shipping containers tested
according to ISTA specifications.  The carton must be checked
upon arrival for external damage.  If damage is found, a
request for inspection by carrier’s agent must be made in
writing immediately.
Inspect the kit carefully on arrival for damage and screws
or wires which may have come loose in transit.  In the event
of damage the consignee should:

1. Make a notation on delivery receipt of any visible

damage to shipment or container.

2. Notify carrier promptly and request an inspection.
3. With concealed damage, carrier must be notified as soon

as possible -  preferably within five days.

4. File the claim with the following support documents

within a nine month statute of limitations.

Original or certified copy of the Bill of Lading, or
indemnity bond.

Original paid freight bill or indemnity in lieu thereof.

Original or certified copy of the invoice, showing
trade and other discounts or reductions.

Copy of the inspection report issued by carrier’s
representative at the time damage is reported to
carrier.

The carrier is responsible for making prompt inspection of
damage and for a thorough investigation of each claim. The
distributor or manufacturer will not accept claims from
dealers for transportation damage.

S

TANDARD

 A

IR

 

HANDLER

 I

NSTALLATION

HKS 

ELECTRIC

 

HEATER

 

KITS

 

MAY

 

ONLY

 

BE

 

INSTALLED

 

IN

 ARUFXX14YY, 

ARPTXX14YY, ASUFXX14YY, ASPTXX14YY, AVPTXX14YY, 
DVXXPTC14YY 

MODELS

 (

WHERE

 XX 

IS

 

THE

 

TWO

-

DIGIT

 

SIZE

 

AND

 YY 

ARE

 

REVISION

 

LETTERS

).

WARNING

ONLY 

INSTALL

 

HEATER

 

KITS

 

INTO

 

AN

 

AIR

 

HANDLER

 

THAT

 

ARE

 

LISTED

 

AS

  

APPROVED

 

ON

 

THE

 

RATING

 

PLATE

 

OF

 

THE

 

AIR

 

HANDLER

WARNING

T

O

 

PREVENT

 

PERSONAL

 

INJURY

 

OR

 

DEATH

 

WHEN

 

INSTALLING

 

IN

 

A

 

GARAGE

THE

 

ELEMENT

 

MUST

 

BE

 

AT

 

LEAST

 18” 

ABOVE

 

THE

 

FLOOR

.

WARNING

T

O

 

AVOID

 

PROPERTY

 

DAMAGE

 

OR

 

PERSONAL

 

INJURY

 

DUE

 

TO

 

FIRE

USE

 

ONLY

 

COPPER

 

CONDUCTORS

.

CAUTION

1. Remove the upper access panel from the air handler.
2. Remove and retain the four (4) screws securing the cover

plate.  Remove and discard the cover plate.

3. For electric heat kits with circuit breakers, remove the

two screws securing the circuit breaker mounting plate
to the electric heat face plate.

NOTE:

 The circuit breakers for the 25kW are placed

separately in the carton and are not attached to the
heater plate.

4. Slide the electric heat kit into the opening in the air

handler, making sure the direction of airflow decal
attached to the electric heat face plate is pointing in
the correct direction, and secure the electric heat face
plate using the screws removed in Step 2.  Use caution
to not bend or damage the electric heating elements,
the limit switches or fuses during this process. See Figure
1.

Airflow

Direction

Figure 1

5. For downflow applications with electric heat kits that

have circuit breakers, the circuit breakers must be
rotated 180 degrees (such that the ON position will
be with the circuit breaker handles up).  To do so,
remove and retain the 2 screws securing the circuit
breaker clamps, rotate the circuit breakers and
clamps 180 degrees, then use the same 2 screws to
re-secure the circuit breakers.  See Figure 2.

Отзывы: