background image

5

SUCTION PRESSURE

PSIG  

R-22  

R-410A  

50

26

1

52

28

3

54

29

4

56

31

6

58

32

7

60

34

8

62

35

10

64

37

11

66

38

13

68

40

14

70

41

15

72

42

16

74

44

17

76

45

19

78

46

20

80

48

21

85

50

24

90

53

26

95

56

29

100

59

31

110

64

36

120

69

41

130

73

45

140

78

49

150

83

53

160

86

56

170

90

60

SATURATED SUCTION PRESSURE

 TEMPERATURE CHART

SATURATED SUCTION 

d.  If subcooling is high and superheat is low, adjust TXV 

valve to 7 to 9 ºF superheat and remove charge to lower 

the subcooling to 7 to 9ºF.

NOTE: Do NOT adjust the charge based on suction pressure 

unless there is a gross undercharge.

Disconnect manifold set, installation is complete.

NOTE: Check the Schrader ports for leaks and tighten valve 

cores if necessary. Install caps finger-tight.

SUBCOOL FORMULA =

SAT. LIQUID LINE TEMP. - LIQUID LINE TEMP.

SUPERHEAT FORMULA =

SUCT. LINE TEMP. - SAT. SUCT. TEMP.

 

LIQUID PRESSURE

PSIG  

R-22  

R-410A  

200

101

70

210

105

73

220

108

76

225

110

78

235

113

80

245

116

83

255

119

85

265

121

88

275

124

90

285

127

92

295

130

95

305

133

97

325

137

101

355

144

108

375

148

112

405

155

118

415

157

119

425

n/a

121

435

n/a

123

445

n/a

125

475

n/a

130

500

n/a

134

525

n/a

138

550

n/a

142

575

n/a

145

600

n/a

149

625

n/a

152

SATURATED LIQUID PRESSURE

 TEMPERATURE CHART

SATURATED LIQUID 

TEMPERATURE ºF

10.  Supply Duct Connection

1.  Top flanges can be bent for ease in installation to the 

duct flanges. (See Figure 6)

Содержание DOWNFLOW

Страница 1: ...PFLOW DOWNFLOW COILS INSTALLATION INSTRUCTIONS 2 1 Handling Use caution when transporting carrying unit Do not carry unit with hooks or sharp object The preferred method of carrying the unit after arr...

Страница 2: ...the preferred wrapping material 1 Ensure drain pan hole is NOT obstructed 2 To prevent potential sweating and dripping on finished space it may be necessary to insulate the condensate drain line loca...

Страница 3: ...Y RECOMMENDED TO PREVENT SCORCHING OR MARRING OF THE EQUIPMENT FINISH WHEN BRAZING CLOSE TO THE PAINTED SURFACES USE BRAZING ALLOY OF 5 MINIMUM SILVER CONTENT NOTE Refrigerant tubing must be routed to...

Страница 4: ...line set into liquid tube expansion and slide grommet about 18 away from braze joint 6 Insert suction line set into suction tube expansion and slide insulation and grommet about 18 away from braze joi...

Страница 5: ...onnect manifold set installation is complete NOTE ChecktheSchraderportsforleaksandtightenvalve cores if necessary Install caps finger tight SUBCOOL FORMULA SAT LIQUID LINE TEMP LIQUID LINE TEMP SUPERH...

Страница 6: ...ling Along The Panel Gap IMPORTANT NOTE To prevent cabinet sweating and airflow leak apply field provided insulation tape along all joining surfaces between the coil gas furnace duct work and panels S...

Страница 7: ...uminum coils TP 109 is also available on the web site in Partner Link Service Toolkit NOTE Ensure coils are rinsed well after use of any chemical cleaners 16 Start Up Procedure WARNING HIGH VOLTAGE DI...

Страница 8: ...F Heating Supply Air Temperature DB F Temperature Rise DB F Delta T Difference between Supply and Return Temperatures DB F AirHandler Coil InverterMatched INVERTERAH COILONLY Check EEV and EEV wiring...

Страница 9: ...9 THIS PAGE LEFT INTENTIONALLY BLANK...

Страница 10: ...10 THIS PAGE LEFT INTENTIONALLY BLANK...

Страница 11: ...11 THIS PAGE LEFT INTENTIONALLY BLANK...

Страница 12: ...oduct brand you purchased to be directed to the feedback page DAIKIN AMANA BRAND GOODMAN BRAND PRODUCT REGISTRATION Thank you for your recent purchase Though not required to get the protection of the...

Отзывы: