MEASUREMENT OPERATION
32
3.
Connect the test leads to the DUT.
The measured value shows on the display.
Note
It takes a longer time to measure a capacitance of more than 100μF.
The LCD displays
OL
to indicate that the tested capacitor is shorted or it exceeds
the maximum range.
When capacitance measurement has been completed, disconnect all the
connections between the multi-purpose socket, capacitor and the Meter.
Содержание GDM-360
Страница 5: ...Table of Contents 3 Replacing the Fuses 71 USB and RS232C Serial Port 73...
Страница 24: ...MEASUREMENT OPERATION 22 C Resistance Measurement see figure 4 mAuA COM V Hz figure 4...
Страница 27: ...GDM 360 397 398 461 User Manual 25 D Testing for Continuity see figure 5 figure 5...
Страница 29: ...GDM 360 397 398 461 User Manual 27 E Testing Diodes see figure 6 figure 6...
Страница 32: ...MEASUREMENT OPERATION 30 F Capacitance Measurement see figure 7 mAuA V Hz figure 7...
Страница 37: ...GDM 360 397 398 461 User Manual 35 H Temperature Measurement GDM 397 only see figure 9 figure 9...
Страница 39: ...GDM 360 397 398 461 User Manual 37 I Transistor hFE Measurement GDM 398 only see figure 10 figure 10...
Страница 41: ...GDM 360 397 398 461 User Manual 39 J EF Function GDM 398 only see figure 11 figure 11...
Страница 73: ...GDM 360 397 398 461 User Manual 71 Replacing the Fuses figure 13...