
4
ART 7AW/G+
IP G+
www.golmar.es
4. DEVICE INSTALLATION
1- Avoid exposing the monitor to backlighting from light
sources for optimal picture quality.
1,65m máx
1,45m máx
1,85m máx
16-03-2020
Mon
View
Intercom
Events
Settings
11:24
2- Place the top of the monitor at a height of 1,65 m
for a correct viewing of the screen.
1,65m máx
16-03-2020
Mon
View
Intercom
Events
Settings
11:24
Monitor location.
Necessary elements to complete an installation:
• FA-G+ power supply for each 8 devices (door panels, monitors...).
• Make the distribution of the different devices through 4 distributed outputs D4L-G+/PoE distributors or via standard PoE
switches.
• Choose 6502/G+ door panels, or a modular composition for the Nexa panel to be able to register all the units in it and set a
video intercom system as such.
In case of daisy-chain distribution of the devices (IN/OUT), use DCP/G+ injectors, accompanied by a FA-DC48/G+ power supply
and DCS/G+ ethernet switches in the monitors.
Use the monitor stand so that the monitor is at the above
mentioned height.
Place it in a flat surface which allows a good fit of the stand to
the wall.
3.1. Jumper description
FPOE
SPOE
FPOE
SPOE
We will be able to choose what supply voltage will be necessary for the correct operation of the device through the jumper located in the back side
of the monitor as follows:
48 V standard PoE (default position).
The device is ready to receive 48V from a PoE standard switch.
18 V.
The device is ready to receive 18V from a D4L-G+/PoE or from a
DCS/G+ ethernet switch.