14
Operation
Common Spraying Methods
To ensure complete coverage in general field
applications, Goldacres suggest that two
spray swaths (depending on boom size fitted)
are completed around the outside perimeter of
the field. After completing the outside laps you
will now have a wide headland on which to
turn when completing the remaining sections
moving up and down the length of the field. To
avoid over application of chemical, switch off
boom sections as you pass over the already
completed headland section.
NOTE:
Variations in field sizes, shapes and
terrain may require a change in the spraying
method. Please use the most appropriate
method that is safe and suitable for your
application.
PTO Shaft Connection
These 3PL sprayers have been designed for
connection to Category 1 and 2 linkages.
1. Remove from pallet (if attached) and
position on a solid, flat surface.
2. Lower the tractors linkage arms to a height
appropriate for connection to the sprayer’s
lower linkage pins, and then connect the
tractors top link to the top linkage pin of
the sprayer.
3. Make sure that all securing pins are in
place prior to raising 3PL.
4. Lift 3PL to intended spray height and then
adjust linkage top link to level the sprayer.
5. Fit PTO shaft as per the following
Instructions: When hitching a sprayer,
especially for the first time, the following
critical points concerning the PTO
shaft must be considered: MAXIMUM
OPERATING LENGTH LB Try to obtain the
greatest possible overlap.
NOTE:
In its working position, the PTO shaft
must not be extended by more than half
the profile overlap Pu available when fully
compressed Lz.
Chains
Chains must be fitted so as to allow sufficient
articulation of the shaft in all working positions.
The PTO shaft must not be suspended from
the chain.
Continued over page
Содержание 3PL 1000L
Страница 1: ...3PL Small Frame Operator s Parts Manual GA8701054 REV 0 APR 2019 ...
Страница 60: ...60 www goldacres com au ...