2 /
4
part no. 03 023 51 f
DESIGN
Inlet connection
Outlet connection
Grey cover
Housing of MIC combined service box
Operating handle Quick-acting stop valve
(horizontal flow direction)
Black surface-mounted cover
Oil pressure regulator
Openings for wall installation
CONNECTIONS
Inlet, Outlet,
optional
Trading name and dimensions
acc. to standard
Compression fitting RVS
•
G.15
= compr. fit 8
•
H.9
= compr. fit 8
ASSEMBLY
Before assembly, check that the product is complete and has not suffered any damage during
transport.
Installation, maintenance and start-up may only be carried out by companies that are
specialist companies for this work in terms of Section 3 of the German Ordinance on Facilities
Handling Substances Hazardous to Water (VAwS) from 31 March 2010 (Federal
Law Gazette, P. 377). Unless, as the manufacturer of this product, GOK carries out the work
with its own specialist employees. Installation may also be carried out by professional
personnel. The labour law regulations are not affected by this.
The specialised company and the operator must observe, comply with and understand all of
the following instructions in this assembly and operating manual. For the system to function
as intended, it must be installed professionally in compliance with the technical rules
applicable to the planning, construction and operation of the entire system.
Risk of injuries due to blown-out metal chips!
Metal chips may cause eye injuries.
Wear safety goggles!
Malfunctions caused by residues!
Proper functioning is not guaranteed.
Visually check that there are no metal chips or other residues in the connections!
It is important that metal chips or other residues are blown out!
Install with suitable tools, if required.
Regarding screw connections, use a second spanner to brace against the connection nozzle.
Do not use unsuitable tools, such as pliers.