7. CONNECTIONS

The battery cells are connected in series using welded lead connectors.

8. MAINTENANCE

KEEP RECORDS… 

Showing charging and equalization dates and times.  After each watering (and 

subsequent equalization), record the specific gravity, temperature, and open circuit voltages for each 

cell of the battery.  These records are required to maintain your warranty.

TEMPERATURE…

 Under normal operating conditions, the electrolyte temperature should be between 

60-100 °F (15-38 °C).  Operating temperatures above 100 °F will reduce the battery’s service life.  

Operating temperatures below 60 °F result in less capacity and special charging is required.

WATER ADDITIONS… 

 

 When using any SCR charger with an I-E-I charging profile…

After each 45 calendar days 

of operation to 80% DOD at 5-days per week or when the specific gravity in the cells reaches 

1.335 to 1.345, add water at the end of the charging period (when the battery is fully charged 

and the charger has tapered to its finish rate).  See Section 9.

 

 When using a GNB® SCR200 charger with a Tubular-LMX™ charging profile…

After each 

90 calendar days of operation to 80% DOD at 5-days per week or when the specific gravity in 

the cells reaches 1.335 to 1.345, add water at the end of the charging period (when the battery 

is fully charged and the charger has tapered to its finish rate).  See Section 9.

EQUALIZE… 

After every 10 duty cycles to 80% DOD or bi-weekly, if operating at 5 duty cycles per 

week, and after each water addition.

DEPTH OF DISCHARGE…

  Do  not  discharge  the  battery  beyond  80%  of  the  rated  ampere-hour 

capacity.  Over discharging shortens the battery life and voids the warranty.

CLEANING… 

Keep the top of the battery clean and dry.  See Section 9.

PREVENTIVE MAINTENANCE SCHEDULE… 

(based on five 80% DOD duty cycles per week)

** 

45-days when using any SCR charger with an I-E-I charging profile

 

90-days when using a GNB® charger with a Tubular-LMX™ charging profile

Page 4

Содержание TUBULAR-LMX

Страница 1: ...ashbasins are required 1 5 Batteries produce hydrogen and oxygen gas during charge Keep open flames away Do not check electrolyte level with a cigarette lighter or match Use a flashlight or permanent lights Switch on off away from the top of the battery Do not smoke or create sparks 1 6 Lift batteries with a certified approved hoist crane lift truck or similar equipment Move batteries with trucks ...

Страница 2: ...r with an I E I charging profile in order to achieve a minimum 45 day watering interval To achieve a minimum 90 day watering interval GNB requires the use of a GNB charger with a Tubular LMX charging profile Open the vent caps from each cell and check to see that the electrolyte level is above the plate separators If it is obvious that the electrolyte has spilled out of any cells replace it with e...

Страница 3: ... lead acid batteries the electrolyte temperature must not exceed 110 F 43 C If the battery is continuously operated at or above this temperature the service life of the battery will be severely diminished Under normal operating conditions battery electrolyte temperature should be maintained between 60 100 F 15 38 C Following charging the battery should be allowed to cool down or rest approximately...

Страница 4: ...d water at the end of the charging period when the battery is fully charged and the charger has tapered to its finish rate See Section 9 When using a GNB SCR200 charger with a Tubular LMX charging profile After each 90 calendar days of operation to 80 DOD at 5 days per week or when the specific gravity in the cells reaches 1 335 to 1 345 add water at the end of the charging period when the battery...

Страница 5: ...ctrolyte levels above the plate separators but no higher than 1 8 from the bottom of the vent well Check the electrolyte level quarterly or as necessary depending on battery use prior to charging If the level is not visible below the plate separators add just enough water to cover them and then proceed with charging the battery Otherwise defer watering the battery until the end of the charging per...

Страница 6: ...lls is needed Operation of the sensor and lead wire connections should be checked quarterly Sensor operation can easily be checked by lifting it out of the cell If the light goes OFF the sensor is functional and can be reinserted When the sensor is removed from the cell if the light continues to FLASH check the lead wire connections If after confirming the lead wire connections the light continues...

Страница 7: ...nacceptable amounts of particles and debris A 20 micron or finer filter is recommended NOTE This is in addition to the auxiliary 100 micron BWT filter pre packed with the system b Pressure Minimum height of water reservoir must be ten feet For municipal water supply lines a pressure regulator is required Recomended static system pressure is 15 psi Excessive pressure can cause plugs to snap shut pr...

Страница 8: ... of maintenance and repair service available GNB can also supply all of your battery charger and accessory device replacement part needs For more information in the U S A and Canada call 1 888 563 6300 All others please contact your local GNB battery sales representative 12 RECYCLING U S Federal and State Regulations require that lead acid batteries be handled and disposed of in compliance with st...

Отзывы: