2.3 Outside Dimension of the Device 

 

Figure 5        Outside dimension of GMDE Powervortex306KTL 

 

2.4 Technical Data 

2.4.1 DC Data 

MODEL LIST

 

Powervortex 306KTL HI

 

PV INPUT (DC)

 

 

 

Maximum PV Power [kW] 

6.3 

V

MAX

    PV [Vdc] 

800 

Nominal DC voltage [Vdc] 

640 

MPP Voltage Range [Vdc] 

350-700 

Max. Input Current [A] 

18 

Input Voltage Range [Vdc] 

200~800 

Start PV Voltage [Vdc] 

300 

Stop PV Voltage [Vdc] 

200 

MPP Trackers 

BATTERY INPUT(DC)

 

 

 

Maximum DC Power [kW] 

Full Power Operating DC Voltage Range [Vdc] 

300-800 

Operating DC Voltage Range [Vdc] 

200-800 

Charging Upper Limit Voltage [Vdc] 

Being adjustable according to actual battery 

Содержание Powervortex 306KTL

Страница 1: ...Powervortex 306KTL Three phase Grid Tied Hybrid Inverter User Manual Version 1 1...

Страница 2: ...al System Description 9 2 2 Description of the Device 11 2 3 Outside Dimension of the Device 12 2 4 Technical Data 12 2 4 1 DC Data 12 2 4 2 AC Data 13 2 4 3 General Data 13 3 Installation 15 3 1 Oper...

Страница 3: ...Display 32 4 2 6 Inv Info Menu Display 32 4 3 Settings 32 4 3 1 Language Setting 34 4 3 2 Clock Setting 34 4 3 3 Password Setting 35 4 3 4 Battery Setting 36 4 3 5 Local Address 37 4 3 6 Clear Data 4...

Страница 4: ...nt of GMDE Read this user manual before you start Thank you for purchasing our products this hybrid inverter is highly reliable and efficient due to its convenient design and excellent quality This th...

Страница 5: ...It is especially important to be familiar with the general safety rules for working with electrical equipment 1 2 Safety Rules General introduction These safety related guidelines use the following AN...

Страница 6: ...er handling Personal injury by crushing shearing cutting or striking CAUTION Cancellation of the operating license If the GMDE inverter is operated with a wrong country code the electric supply compan...

Страница 7: ...eeding after disconnecting the hybrid inverter from AC grid PV panels and battery packs Operating the inverter Do not commission the device until the overall system complies with the application speci...

Страница 8: ...age to property any personal injury any damage or injury arising from or as a result of misuse or abuse or the incorrect installation integration or operation of the product We disclaim any liability...

Страница 9: ...the hybrid inverter communicates with the power meter that is installed between the AC grid and the customer load With the power related information sent from the power meter the hybrid inverter can a...

Страница 10: ...f hybrid inverter GMDE hybrid inverter can work with all the EMS units as long as the communication protocol is integrated To request the detailed communication protocol please contact us at service g...

Страница 11: ...s dissipated by the heatsink and fan equipped at the bottom of this device One AC output connector which connect to AC grid and local load Rated conductor size 6 mm 2 Two pairs of PV input terminals e...

Страница 12: ...INPUT DC Maximum PV Power kW 6 3 VMAX PV Vdc 800 Nominal DC voltage Vdc 640 MPP Voltage Range Vdc 350 700 Max Input Current A 18 Input Voltage Range Vdc 200 800 Start PV Voltage Vdc 300 Stop PV Volta...

Страница 13: ...Voltage Frequency Range Hz 47 55 51 45 Nominal Output Current A 8 6 Max Output Current A 9 5 Power Factor 0 95 0 95 Standby Power Consumption W 15 THDI 100 Full Power 3 DC Current Injection Max mA 50...

Страница 14: ...l GFCI and isolation detection function following VDE0126 1 1 Installation Mode Wall mounted Humidity 95 RH Communication Interface USB RS485 Hazard Substance Restriction Lead free complied with RoHS...

Страница 15: ...attery packs and hybrid inverter Note a DC switch is already integrated into the hybrid inverter this DC switch cannot be used to directly switch off the inverter when the inverter is running with pow...

Страница 16: ...re included in the GMDE hybrid inverter package 1 GMDE Powervortex 306KTLx 1 2 User Manual x 1 3 Certificate of Approval x 1 4 Cable Gland for AC grid connection x 1 5 Aviation Plug Male Connector for...

Страница 17: ...The assembly site must be shaded so that the inverter can achieve the highest energy production and the longest life 2 The installation wall must be vertical and can carry the weight of the inverter 3...

Страница 18: ...he first step is fixing the wall bracket and the second step is mounting the inverter All the steps are shown below by the form of illustration The wall bracket can be fixed to the wall by four expans...

Страница 19: ...osition and insert all screws 4 Fix the wall bracket by turning the screws The diagram of mounting the wall bracket is showed below Figure 10 Inverter wall bracket Hang the inverter on the wall bracke...

Страница 20: ...wo pairs of PV input terminals 2 Integrated DC switch 3 One pair of battery input terminal 4 Communication interface includes RS 485 A B USB 5 One AC output connector L1 L2 L3 N G which can connect to...

Страница 21: ...nection PV input terminals 3 4 3 AC Connection There is one AC output terminal as shown in the following figure Figure 14 AC output terminals 1 The AC GRID AC output terminal is equipped with aviation...

Страница 22: ...ses exceed 1 L1 Line 1 L2 Line 2 L3 Line 3 N Neutral G PE 6mm 2 The detailed installation procedures of this AC output terminal is explained as following figures Step 1Insert the cables into male conn...

Страница 23: ...munication ports RS485 and USB Please refer to the following procedures of the communication connection Figure 17 Communication connection communication interface RS485 Configuration GMDE inverter use...

Страница 24: ...his section is only for the Integrated Energy Management Solution in section 2 1 General System Description The wire connection of power meter is shown as below 1 Connect the AC grid to the power mete...

Страница 25: ...ervortex 306KTL Global Mainstream Dynamic Energy Technology Ltd 25 Wire connection Connecting direction RS485 connection 1 RS485 connection 2 Figure 20 Wire connection of power meter Back to Top From...

Страница 26: ...he functions of the navigating keys and indication lightings around the LCD screen are displayed in the following Figure 21 LCD display Table 5 Function introduction Item Symbol Meaning Illustration U...

Страница 27: ...below which are also the default window after the LCD is lighting In solution 1 Figure 22 Main menu of LCD for solution 1 Table 6 Main menu illustration Item Description Operating status of the invert...

Страница 28: ...the main menu by pressing the navigating keys the different energy information both of DC and AC sides could be displayed as the following figure shows Item Description Operating status of the invert...

Страница 29: ...packs Einv Total energy delivered by the inverter Egrid d Total energy injected to the power grid Egrid c Total energy provided by power grid to the customers Eload Total energy consumption of local c...

Страница 30: ...kly and annual historical data can be displayed as shown in Figure 26 Figure 26 The Energy menu structure 4 2 3 Run Info Menu Display The current operating status information could be found in the Run...

Страница 31: ...e PV and battery and AC side grid and load a Run information on DC side b Run information on AC side Figure 28 Run Info menu structure Note Pbat c current charging power Pbat d current discharging pow...

Страница 32: ...Menu Display The manufacture and software version information of the inverter is stored in this menu Figure 30 Menu structure of inverter information 4 3 Settings When turning on the inverter for the...

Страница 33: ...into the setting menu a message boxwill pop up the default password is 6666 Figure 32 Password of change settings Press OK button to finish the password input Press Back button to return By pressing...

Страница 34: ...keys to select the language The default language is English Figure 34 Language setting Press OK button to finish the password input Press Back button to return 4 3 2 Clock Setting While pressing key o...

Страница 35: ...While pressing key on the main setting window the screen enters into Pas Setting The password can be modified as shown in Figure 37 Figure 37 Password setting Step 1 Press into password setting windo...

Страница 36: ...tting the new password please contact the service center of GMDE who will help you to resume the initial password 4 3 4 Battery Setting While pressing key on the main setting window the screen enters...

Страница 37: ...follow the setting starting procedures in section 3 1 4 3 5 Local Address Note In solution 1 with integrated EMS the local address will not be used since the inverter does not communicate with any ext...

Страница 38: ...ress setting Note The default setting is Fixed Add Mode with local address 255 Before communicating with the external EMS the local address should be set as fixed address between 1 to 254 or dynamic a...

Страница 39: ...Global Mainstream Dynamic Energy Technology Ltd 39 c Wait for setting d Setting successful e Fixed address recognition f Setting failed Figure 42 Fixed local address setting a Select Dynamic Add Mode...

Страница 40: ...address setting After the setting of local address the address information could be observed in Inv Info Window show in 4 3 6 Clear Data In this menu all the historical data can be deleted Please ensu...

Страница 41: ...te all the historical data Press Back button to cancel 4 4 Fault Warning and Historical Information Deleting In section 4 3 5 all the historical data including fault and warning information can be del...

Страница 42: ...box will pop up Figure 47 Energy data deleting Press Yes button to delete the historical data in this page press No button to cancel 2 On the Fault Alarm menu window by pressing keys at the same time...

Страница 43: ...fined by a fault having been present for more than 15 minutes and cannot be acknowledged by inverter s auto restart Unlike permanent failure a transient failure is automatically acknowledged by the in...

Страница 44: ...able value Acknowledge error GFCI Warning Residual current is out of range Wait until the controller has re stabilized GFCI Device Warning The GFCI detection circuit is abnormal Wait until the control...

Страница 45: ...ue between master and slave for output DC current Wait until the controller has re stabilized Bus Start Warning DC bus soft start is over time Wait until the controller has re stabilized Bus Low Warni...

Страница 46: ...r limit Check battery packs Contact the service if the error occurs repeatedly Low battery energy The battery energy is too low Check battery packs Contact the service if the error occurs repeatedly E...

Страница 47: ...vice Rly Fail Relay is Fail Contact the Service Table 9 Fault sand actions 5 4 Fault Acknowledgement After shutdown due to a fault the device remains locked against reactivation until the fault is ack...

Страница 48: ...on3 1 Operation Sequence 6 2 Visual Inspection You should conduct visual inspection at least once a year The visual inspection includes checking the machine cover interface and screen 6 3 DC Switch Ye...

Страница 49: ...Contact If you have any questions about our product please contact us GMDE Room 604 605 Tongpu Road No 1220 Putuo District Shanghai 200333 P R China TEL 86 21 60710809 818 FAX 86 21 61730300 E mail S...

Отзывы: