OPERATION
10/12
13
4. Crimping cables
Insert the cable (1) straight into the funnel guide
until it stops.
Crimping and stripping works automatically.
Pull out the cable (2) straight when the mc 25
has stopped.
!
Refer to chapter faults when operating
faults or unsuccessful crimping
occurs.
Read counter (3) if required and set it to 0 with
the reset button (4).
5. Stop operation
Read counter (1) if required.
Turn off (position 0) the mc 25 with the mains
switch (2).
6. Daily maintenance
Disconnect the mains supply from the
mc 25 and open cover.
Turn off (position 0) the mc 25 with mains
switch (1).
Disconnect mains cable (2).
Slide the cover (3) back.
Remove (4) insulation scraps inside the mc 25.
Pull out the container (5).
Dispose insulation scraps and insert container.
Close the cover (6).
Connect mains cable (7).
Diagram 13
Crimping cables
Diagram 14
Stop operation
Diagram 15
Daily maintenance
Содержание MC 25
Страница 2: ...MC25...
Страница 3: ...MC25 Betriebsanleitung MC 25 Ausgabedatum 01 2020 F r k nftige Verwendung aufbewahren...
Страница 4: ...MC25...
Страница 6: ...10 12...
Страница 35: ...MC 25 Instruction for use MC 25 Date of issue 01 2020 Save this instruction for further use...
Страница 36: ...MC 25...
Страница 38: ...10 12...
Страница 67: ...Instructions d emploi MC 25 Date d dition 01 2020 A conserver pour utilisation ult rieure...
Страница 68: ......
Страница 70: ...10 12...
Страница 99: ...Manual de instrucciones MC 25 Fecha de edici n 01 2020 Guarde estas instrucciones para su uso posterior...
Страница 100: ......
Страница 102: ...10 18...